My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7071
CWCB
>
UCREFRP
>
Public
>
7071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 11:32:55 AM
Creation date
8/10/2009 12:33:09 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
7071
Author
Bosley, C.
Title
Pre-Impoundment Study of the Flaming Gorge Reservoir.
USFW Year
1960.
USFW - Doc Type
Cheyenne.
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-73- <br />of water will result in deeper penetration, thus greater and pro- <br />longed leeching of alkaline materials from the soil will result. <br />(5) Increased turbidities. - The Green River carries a heavy silt load <br />during spring run-off, but is normally quite clear by July. Under <br />anticipated operations the Seedskadee Project will contribute silt <br />from irrigation waste waters until the latter part ~f September. <br />The Big Sandy River contributes a large part of the silt carried <br />in the Green River during the summer months. A combination of <br />silt carrying waters from the Big Sandy, anticipated .silt load <br />in irrigation water from the Seedskadee Project, plus a reduction <br />of river flows and the associated diluting effect in the Green <br />River below Fontenelle Dam may contribute materially to the elim- <br />ination of game fish habitat from the mouth of the Big Sandy River <br />downstream. <br />RECOI~IENDAT IONS <br />It is recommended that the trash fish populations in the Green River <br />above the Flaming Gorge impoundment area be depressed to the greatest possible <br />extent. This would necessarily be accomplished by a complete chemical treat= <br />meat program cooperatively initiated by the states of Wyoming and Utah. It <br />is also recommended in view of the fact ,that carp populations have been found <br />by the fisheries management crew in the Green River proper as far upstream as <br />the mouth of the New Fork River, in the New Fork River as far as the mouth of <br />the East Fork River, in all the sloughs. and tributaries included in these <br />drainage sections,. that the chemical treatment be extended to include these <br />areas. Also, this treatment should be extended up the Green River beyond <br />the mouth of the New Fork River to the mouth of Horse Creek. Omitting these <br />upper sections would only result in an accelerated re-infestation of trash <br />fish in the treated areas. <br />The following chart is an itemized cost of treating the section of the <br />Green River proper as described above and the tributaries entering the Green <br />River throughout the proposed area. of treatment. This estimation was pre- <br />pared by Fred W. Jackson, District .Fisheries Biologist. <br />The estimates of toxicant quantities is based on the average water flows <br />during the latter part of September and early October. Present plans call <br />for impoundage to begin in September, 1962. Toxicant applied in the fall of <br />1962 .would allow time for dissipation. before stocking in the spring of 1963. <br />Timing of toxicant application and dam closure will have to coincide as any <br />delay would result in a pool being formed which would make the cost of treat- <br />ment prohibitive. <br />In the event that the dam is not completed until the spring of 1963, the <br />estimates may be revised to fit spring flows by multiplying the gallons of <br />rotenone and cost .by a factor of four. <br />
The URL can be used to link to this page
Your browser does not support the video tag.