Laserfiche WebLink
-61- <br />A section of this report dealing with access requested that funds be <br />made available for development of the Holmes Ferry and Marsh Creek sites. <br />"I'he following is a breakdown of anticipated expenditures requested in <br />this report. <br />TABLE <br />Anticipated .Fisherman Access Expenditures <br />20 Acres of Land (Minimum of 10 acres per site) $ 200.00 <br />Fencing and Cattle Guards Both Sites) ~ 1,500.00 <br />Sanitary Facilities ~4 units) 600,00 <br />Garbage Pit Installation (4 units) 300,00 <br />Two Concrete Launching Ramps 650 feet long by 16 feet <br />wide on 14% grade, @ $20.00 per lineal foot graded <br />and installed 30,000.00 <br />TOTAL COSTS $32,600.00 <br />