Laserfiche WebLink
<br />annually. Even more importantly, these values tend to increase each year <br />as trout fishing opportunities become better known. Additionally, guides <br />work all these rivers and reservoirs, generating further income. <br /> <br />B. TRANSMISSION DIVISION <br /> <br />The power system includes high voltage transmission lines that inter- <br />connect to the CRSP hydro-powerplants and deliver power to major load <br />centers or to other delivery points. The system is interconnected with <br />adjacent Federal, public and private utility transmission systems. The <br />Transmission Division was transferred to the Western Area Power Admin- <br />istration (WAPA), Department of Energy, in fiscal year 1978. <br /> <br />Generation at eRSP powerplants amounted to 4.68 billion kilowatt <br />hours during water year 1991. The major portion, 3.64 billion kilowatt <br />hours, was produced at Glen eanyon Dam. The balance was produced <br />at Flaming Gorge, Blue Mesa, Morrow Point, erystal and Fontenelle <br />Dams. <br /> <br />The following table lists the gross generation for fiscal years 1990 and <br />1991 and the percentage of change: <br /> <br />GROSS GENERATION KWH <br /> PERCENT <br />POWERPLANT FY 1990 FY 1991 CHANGE <br />GLEN eANYON 3,793,819,000 3,644,883,000 - 3.9 <br />FLAMING GORGE 260,302,000 305,850,000 + 1.2 <br />BLUE MESA 149,329,000 236,476,000 + 36.8 <br />MORROW POINT 197,203,000 289,637,000 + 31.9 <br />eRYSTAL 91,181,000 143,098,000 + 36.3 <br />FONTENELLE 58,753,000 62,298,000 + 5.7 <br />TOTAL: 4,550,587,000 4,682,242,000 + 2.8 <br /> <br />39 <br />