Laserfiche WebLink
Code of Crnmsent <br />g.4 We can only suggest funding levels and tasks for agencies <br />involved with the humpback chub. Because,BIA is directly <br />or indirectly responsible for lands and rivers that may <br />impact humpback chubs, we have invited BIA to participate <br />in habitat management. <br />G-1 This is the intent of Task 34. <br />S No reply required. <br />I-1 In the teat, the Yampa River in Dinosaur National Monument <br /> is considered seperately from the Green River in Dinosaur <br /> National Monument. However, because the reaches of the two <br /> streams inhabitated by humpback chubs are near the confluence <br /> of the two rivers, the two areas appear as one on the pap. <br />I-2 All viable methods will be considered ae sampling techniques <br /> by agencies and, consultants doing field research oa humpback <br /> chubs. <br />I-3 Starch-gel-electrophoresis is one of many techniques that <br /> will be used to investigate the relationships between members <br /> of the geaus Gila. <br />I-4 The Recovery Tesm can only recommend tasks and funding levels <br /> for the recovery effort to the agencies involved. Willow <br /> Beach NFH was suggested because the Fish and Wildlife Service <br /> already has humpback chubs there. It is the responsibility <br /> of the agencies to determine which branch of the agency will <br /> complete the tasks and to appropriate foods accordingly. <br />J No reply required. <br />1 The Recovery Team understands that one specimea of Gila was <br /> collected during fall sampling oa the White River. It was <br /> tentatively identified as G. ele ans or a member of the Gila <br /> complei. <br />Ir-1 The Recovery Team believes that information caa be gathered <br /> for Tasks 12, 13, and 22 while Task 11 is being completed. <br /> We need the information as soon as possible and caa not <br /> afford to wait until Task 11 is completed before beg{nnin <br /> the other projects. We agree that several of these tasks can <br /> be carried out as a single project, but for the Step-Down- <br /> Plan prefer to keep them separate. <br />67 <br />