My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1005
CWCB
>
UCREFRP
>
Public
>
1005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 11:32:54 AM
Creation date
8/10/2009 12:05:32 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
1005
Author
WBLA.
Title
Curecanti Minimum Stream Flow Water Rights Study-Draft.
USFW Year
1986.
USFW - Doc Type
\
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1. U.B. Depletions are depletions above Blue Mesa, and consist of <br />depletions under water rights senior to the Curecanti decrees and <br />under junior water rights which benefit from the subordination of the <br />Curecanti decrees. <br /> <br />2. Blue Mesa Target Releases only include releases to make storage <br />targets which do not serve some other purpose like minimum stream flow <br />maintenance or M&I supplies. <br /> <br />3. Blue Mesa releases for other purposes may include both releases to <br />make target and releases below target. <br /> <br />4. Blue Mesa MSF or T&B Releases orlly include releases to maintain <br />minimum stream flows in the 29-mile reach; releases to maintain <br />endangered fish flows at Westwater are separately reported. <br /> <br />5. Blue Mesa Power Outflows consist of all storage bypasses and releases <br />which fit through the Blue mesa power outlet. Blue Mesa Spills or <br />Other Outflows consist of any storage bypasses which do not fit <br />through the power outlet and must be passed through the Blue Mesa <br />river outlet or over the spillway. <br /> <br />6. Morrow Point Gains and Depletions refer to inflows and depletions <br />between Blue Mesa and Crystal. The depletions are assumed to occur <br />under water rights senior to Curecanti or which benefit from the <br />subordination of the Curecanti decrees. <br /> <br />7. Taylor Park Releases only include Taylor Park storage releases to meet <br />irrigation demands at the Gunnison Tunnel. Taylor Park exchange <br />releases are illustrated in Appendix D. <br /> <br />8. Total diversions at the Gunnison Tunnel are reported (Tunnel) and are <br />broken down into diversions under the senior irrigation water right <br />(Irrig.) and under the junior hydropower right (Power). <br /> <br />9. MSF Shortages are based on the DroDosed minimums shown on Table 1 for <br />the 29-mile reach; no shortages occur in meeting the criteria for <br />endangered fish flows at Westwater. <br />
The URL can be used to link to this page
Your browser does not support the video tag.