Laserfiche WebLink
C'ommittee shali cav~erate with Praject participants tc~ meel thvsc dcmarids <br />wh~xn~v~r feasible at~~l practic~l. <br />~.02 Whenc~er ~easible and pracrical, Pra~ect pariicipants shall take delir~~rp af their <br />portian a1 the Praject water suppIy by direct AI.P di~ersians (``Ri~er Water'} <br />withaut putting it in storage. <br />~.fl3 T~e Pra3ect shaIl be nperated ta maintain a laint Stora~e Pool far thc benefit af all <br />PrU}ect participants. Th~ Praject water supply in the ]vint Stvrage P~l shall he <br />at~ocatcd amvn~ Project participants whase water supplies will nnt be satisfied <br />trvm River Watcr. <br />~.U4 Unless and until the City af Duran~n agnees tv take its Projeet water in accordance <br />with the ~ther provisior~s af this dvcument. ~,133 a~re fe.~et of th~: acti~e stvrage <br />cap~city afth~ Et4serr~vir shall be aperated and ac~ounted as the Durangv PooI, <br />and th~ rcmainder of the acti~e st~rage capacity shall be operated and accaunted <br />as the Joint Storag~ €'oal. Th~ Duranga Pcwl, and all war.er stv~.~d ttxerein, will lae <br />a-~ailablc anly far use by the City vf Durango cv supplement direct diversians <br />ar~aitable to fultill the City ofDurango's annual Praject water supply. Water <br />di~erted into the Reservair to fill or refill Project stora~,e ca~~ity will be allac.ateci <br />tn the City a#`i]urango pra rata to the share the D~rango Paal r~presents csftntai <br />a~ti~ e f'raject stora~e capactty; that is, af ev~ry ac:re f~at of water di~erEed inta <br />stnrage, ?,133~ 95,03~ acre feet vsril~ he atl~cated and a~counted to thc Durango <br />Pool until 17urangv's ?,133-aGre-fant cap is met, and the halance ta the ]Uint <br />Stnrage Panl. E~apnratian and seepage fram Ridg~s Basin Reser~oir will ~e <br />~ltacated to the ~uranga Faol pro ra#a ta the share the Duran~a PanI represents ~#' <br />the total actir+e Pr~ject starage capacity. <br />~.OS A Project participant's unused ~llacatians af Project r~vater supply in the ]oint <br />StQra~e Pac~l shal~ not he carried o~er in the rnonth-~o-rnanth~ accaunting. <br />4.~5 Wat~r atherwise a~ailabie for di~ersean hy the Project and passed hy the Durango <br />Pumping Platnt ta rneet federal enviranmenta4 requirements far ItI,P shall be <br />a~ailable fvr dir~.-ct diversian by Project participants d~wnstream af the I]-~ran~o <br />Pumping Plant, pro-~ided that su~h water is id~ntifcd and a~caunted For as Project <br />v-~ater in acGardanee with Paragraphs ~ and I0. <br />~.07 A Pro~ect participant may ele~t to take cfetivery of less than its full Statutary <br />Water Allacativn in any year withaut iosing fihe right ta deii~ery of its full <br />entitlement in future years. A Pr~ject parti~ipant's e~ection to not take f~ll <br />delivery Uf its 5tatutary Water AIlacativn Shal1 nvt ~nnstit~te ~vidence: v~'ar~ <br />intentian ta aband~ th~ water right. <br />~.08 A Project particip~nt may not take delir+ery nf mvre than its Sta.tutary Water <br />Pa~e 2 of 7 <br />