Based on inforination learned froin aquatic research, fish sainpling, soils investigation <br />and e~isting site conditions such as creek hvdrolog~-, land o~vnership, vegetation, etc., the <br />design team ~vill identifi- potential alternatives to provide passage of the target species. <br />Task 5. Land Acquisition <br />The options identified in Task 4 ina~- require land acquisition and/or a construction <br />easement in order to construct the fish passage or gain access to the site for construction <br />activities The Project Teasn ~vill meet ~vith the e~isting lando~vner on the east side of <br />Fountain Creek to discuss the possibilitv of acquiring land to accommodate a fish passage <br />or construction access onto their propertv. Colorado Springs Utilities ~vill coinplete land <br />acquisition surve~-ing, legal description, agreements, etc from in-house resources. <br />Task 6. Identify Preferred Fish Ladder Options <br />Based on all of the results from Task 1 through ~, the Project Team ~vith concurrence <br />with the Client will identify the best option for a fish ladder. <br />Task 7. 60% Design and Estimate of Probable Construction Costs <br />Coinplete appro~iinatelv 60% coinplete design and engineering construction drawings, <br />details, specifications and estimate of probable construction costs. <br />Task 8. 90% Design and Estimate of Probable Construction Costs <br />Coinplete appro~iinatelv 90% coinplete design and engineering construction drawings, <br />details, specifications and estimate of probable construction costs. <br />Task 9. 100% Design and Estimate of Probable Construction Costs <br />Coinplete appro~iinatelv 100% coinplete design and engineering construction drawings, <br />details, specifications and estimate of probable construction costs. <br />Task 10. Permitting <br />Prepare Nation`vide 404 Permit. <br />Task ll. Prepare CWCB and CDOW Grant Applications for Construction of <br />Fish Ladder <br />Prepare grant applications to the CWCB, CDOW, USACE and others for the <br />construction, bidding, and construction inanageinent and grant adininistration of CWCB <br />and CDOW requirements for the fish ladder project. <br />3.3.5. Project Time Schedule <br />See attached Project Schedule in Appendi~ <br />3.3.6. Monitoring Plan <br />The CDOW and USGS ~vill continue to sainple fish species belo~v and above the dasn site after <br />the fish passage has been constructed. The on-going inonitoring ~vill allo~v the fish passage flo~vs <br />to be fine tuned in order to ensure that the target fish is able to negotiate the passage. Ad_just~nents <br />will be made bv either CDOW or USGS on a regular basis. In addition, seasonal adjustments will <br />be inade to correspond ~vith ~vhen the target fish (or anv other identified fish species) ~vill be <br />inoving, and therefore, utilizing the fish passage. <br />