My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
15d_Directors Report
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
15d_Directors Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:35:50 PM
Creation date
8/5/2009 12:01:44 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/21/2009
Description
Directors' Report - CWCB Director
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Projects under Construction <br />1. Grand Mesa Reservoir Company – Rehabilitation of Reservoir No. 1 and No. 9 <br />Authorization: Construction Fund County: Mesa <br />Water Source: Gunnison Project Yield: 1,000 Acre - Feet <br />Terms of Loan: $200,000@ 2.4% for 20 - years Project Type: Reservoir Rehabilitation <br />The Grand Mesa Reservoir Company operates 6 reservoirs on the Grand Mesa to supply water to <br />16 shareholders for the irrigation of 500 acres. This project involves the replacement of the <br />outlet structu res at each reservoir and also addresses seepage problems at each facility. The <br />project was designed by the City of Grand Junction, one of the major shareholders, and is <br />currently being constructed by the City of Grand Junction. The outlet structures ha ve been <br />installed and the seepage problem corrected at both reservoir locations. The City of Grand <br />Junction is draining the two reservoirs to install the new outlet gates. The p roject has been on <br />hold pending resolution of construction and water rights issues between the City and the <br />Company. These issue s have recently been resolved, with the final phase of the project <br />scheduled to commence constr uction during the summer of 2009 . <br />2 . New Cache La Poudre Irrigation Company – Reservoir Construction <br />A uthorization: Construction Fund County: Weld <br />Water Source: South Platte Project Yield: 4,500 acre - feet <br />Terms of Loan: $7,200,000 @ 2.50% for 30 - years Project Type: New Reservoir <br />The New Cache La Poudre Irrigation Company currently provides irrigati on water to a 35,000 - <br />acre service area. The purpose of this project is to provide water storage to equalize ditch flows, <br />to improve efficiency and the reliability of the Company’s system, and for providing additional <br />storage to meet future demands. The project will involve the construction of 3 separate <br />reservoirs near the Town of Barnesville, Colorado, totaling 4,500 acre - feet of storage. <br />Additionally, 8,200 linear feet of pipeline will be installed in construction with the reservoirs. <br />Smith Geotechn ical, Fort Collins, Colorado is the project designer. The Barnesville Reservoir <br />project was awarded to Barker Construction, Fort Collins, Colorado and has been completed. <br />The pump station from Barnesville Re servoir to Cornish Reservoir has been complet ed as well. <br />The design for Cornish Reservoir has been completed and has been awarded to Barker <br />Construction, Fort Collins, Colorado for construction. T he C ontractor has completed the work <br />and is waiting on final SEO approval. The Company requested tha t CWCB’s cost participation <br />be changed from 75% to 89% to allow the full $7,200,000 of loan funds to be relea sed, which <br />was approved at the September 2007 Board Meeting. The project will remain open until the l and <br />purchased to construct Cornish Reservoir is paid off in 2011. <br />3 . Orphan Wells of Wiggins – Augmentation Project <br />Authorization: Construction Fund County: Morgan <br />Water Source: South Platte Basin Project Yield: 6,000 acre - feet <br />Terms of Loan: $1,037,700 @ 2.5% for 30 - years Project Type: Wel l Augmentation <br />The Orphan Wells of Wiggins is a new company comprised of 31 separate agricultural operators that <br />own 45 wells which irrigated approximately 4 , 500 acres of farmland. This project involves the <br />construction of 1 recharge well, 1 augmentation well, various pipeline, and 23 recharge ponds. The <br />project will generate augmentation credits to cover the depletions for the 45 existing wells. The <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.