Laserfiche WebLink
CWCB Construction Loan Program <br />Project Data Sheet <br />Borrower: Co unty <br />Farmers Reservoir and Irrigation Co . : Adams & Weld <br />Project Name: Project Type : <br />Milton Reservoir and Bar r Lake Reservoir Spillway and Outlet <br />Improvements Works <br />Drainage Basin: Water Source (s) <br />South Platte : Beebe Seep Canal / Platte <br />Valley Canal / O’Brian Canal <br />Total Project Cost: Funding Sources: <br />$ 3,88 4 ,000 Construction Fund <br />Type of Borrower: Average Delivery : <br />Blended Ag & Municipal 125,000 AF <br /> & Commercial <br />Loan Amount: Interest Rate: Term: <br />$ 3,535,000 (Including 1% fee) 3 . 7 % 3 0 years <br />Farmers Reservoir and Irrigation Company operates a ditch and reservoir system extending 3,500 <br />square miles along the Front Range corridor, from Golden to Kersey, Colorado. The system <br />consists of four major reservoirs (Standley Lake, Marshall Lake, Barr Lake and Milton Reservoir) <br />numerous smalle r reservoirs, and approximately 400 miles of diversion and delivery canals. This <br />loan request specifically relates to work to be completed at Milton Reservoir and Barr Lake. The <br />Company intends to complete the following three projects: Milton Reservoir O utlet Works <br />(replacing the upstream outlet gate structure and a portion of the piped outlet works), Milton <br />Spillway (enlarging the existing spillway), and Barr Lake Spillway (enlarging the existing spillway <br />and raising the perimeter dike). These projects have been submitted to the SEO for review. The <br />Company expects to construct these projects between September 2009 and January 2011. <br />MILTON <br />RESERVOIR <br />LONGMONT <br />BRIGHTON <br />BARR LAKE <br />DENVER METRO <br />AREA <br />LOCATION MAP <br />