My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9 (3)
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
9 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2016 12:39:50 PM
Creation date
8/5/2009 11:19:49 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/13/2009
Description
OWCDP Section - Water Efficiency Grant Request - City of Grand Junction,Ute Water Conservancy District, and Clifton Water District - Regional Water Conservation Plan
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Step 9- Monitor, Evaluate and Revise Conservation Activities and the Conservation Plan <br />Purpose <br />Coininit to inonitor the perforinance of the plan including updating the plan as required. <br />Approach <br />9.1 linplement the plan: <br />The plan will be iinpleinented and inonitored based on the schedule developed <br />from Step 8. <br />TASK B- PUBLIC REVIEW PROCESS <br />Purpose <br />The Entities will make a draft WCP available in different forms to seek public input on the plan <br />through use of a 60-day public review period. <br />Approach <br />Consultant will attend a Board Meeting for each of the Entities during the 60-day public review <br />period to help answer questions froin the public on the Water Conservation Plan. This ineeting <br />will seek feedback on the Water Conservation Plan from District constituents. <br />The Steering Coininittee, with help froin Consultant, will coordinate the following: <br />• Announcing the publio-review period and inaking the plan publicly available. <br />• Advertising to the public that coininents will be taken at a specific Board Meeting during <br />the 60-day public review period. <br />• Collecting and organizing public coininents. These coininents will be provided to <br />Consultant following the publio-review period. <br />The Consultant will incorporate and respond to public comments in the final draft of the plan. <br />REQiJIREMENTS <br />L The Steering Coininittee and the Entity Boards and staff will review a final draft of the <br />plan and provide comments. <br />2. Consultant will incorporate comments prior to the publio-review process. <br />3. Public comments will be solicited and incorporated into the plan. <br />4. The Entities will forinally adopt the final plan. <br />5. Consultant will submit the final plan to CWCB. <br />6. CWCB will review final plan. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.