My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150297 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150297 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 3:13:22 PM
Creation date
8/5/2009 10:57:54 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150297
Contractor Name
Farmers Reservoir and Irrigation Company
Contract Type
Loan
Water District
0
County
Adams
Weld
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Construction Loan Program <br />Project Data Sheet <br />Borrower: Farmers Reservoir and Irrigation Co. <br />Project Name: Milton Reservoir and Barr Lake <br />Improvements <br />Drainage Basin: South Platte <br />Total Project Cost: $3,884,000 <br />County: Adams & Weld <br />Project Type: Reservoir Spillway and Outlet <br />Works <br />Water Source(s): Beebe Seep Canal / Platte <br />Valley Canal / O'Brian Canal <br />Funding Sources: Construction Fund <br />Type of Borrower: Blended Ag & Municipal <br />& Commercial <br />Loan Amount: $3,535,000 (Including 1% fee) <br />Average Delivery: 125,000 AF <br />Interest Rate: 3.7% Term: 30 years <br />Farmers Reservoir and Irrigation Company operates a ditch and reservoir system extending 3,500 <br />square miles along the Front Range corridor, from Golden to Kersey, Colorado. The system <br />consists of four major reservoirs (Standley Lake, Marshall Lake, Barr Lake and Milton Reservoir) <br />numerous smaller reservoirs, and approximately 400 miles of diversion and delivery canals. This <br />loan request specifically relates to work to be completed at Milton Reservoir and Barr Lake. The <br />Company intends to complete the following three projects: Milton Reservoir Outlet Works <br />(replacing the upstream outlet gate structure and a portion of the piped outlet warks), Milton <br />Spillway (enlarging the existing spillway), and Barr Lake Spillway (enlarging the existing spillway <br />and raising the perimeter dike). These projects have been submitted to the SEO for review. The <br />Company expects to construct these projects between September 2009 and January 2011. <br />~ ~ 1 <br />LOCATION MAP <br />
The URL can be used to link to this page
Your browser does not support the video tag.