Laserfiche WebLink
* Descriptions of any construction activity which would affect the hydraulic <br />capacity of the floodway, indicating existing and proposed base flood <br />elevations. See Cover Letter * Specifications for building construction and materials filting, dredging, <br />channel changes, storage of materials, water supply systems, sanitary <br />facilities, and other utilities. <br />Materials witl consist of native and non-native 3-6ft boulders as well as 2 artificial <br />boulder structures designed to be stable during the 100 yr flood. <br />* The elevation(s) (in relation to mean sea level) of the lowest floor <br />(including basements) of existing and proposed structures. <br />N/A <br />" Where Flood promfing is utilized for a structure, a registered professional <br />engineer or architect shall certirfy that the Flood proofing methods are <br />adequate to withstand the flood depths, pressures, velocities, impact and <br />uplift forces and other factors associated with the base flood. <br />N/A <br />'`Flood proofing certifications, indicating the specific evaluation to which <br />such structures are flood proofed shall be submitted with this application <br />or prior to issuance of a Certificate of Occupancy. <br />N/A <br />The applicant may be required to submit other necessary information in <br />order to determine if appropriate design and performance standards have <br />been met <br />THE APPLICANT REQUEST A PERMIT FOR A PERIOD OF: One Year <br />APPLICANT: Town of Avan, CO <br />BY: River Restoration.org <br />P.O. Box 2123 <br />Glenwood Springs, CO 81601 <br />Name: Jason Carey, PE <br />Title: Principal <br />NOTE: Within ten (10) days following receipt of a completed application for <br />a permit the Floodplain Management Administrator shafl deternnine and set <br />a fee in an amount necessary to cover the costs incurred in the review of