My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Prehearing Statement of Colorado River Water Conservation District
CWCB
>
Water Supply Protection
>
DayForward
>
3001-4000
>
Prehearing Statement of Colorado River Water Conservation District
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:41:25 PM
Creation date
7/27/2009 10:50:09 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8230.51A2
Description
Objectors' Prehearing Statement
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
6/17/2005
Author
Peter C. Fleming, Steven M. Mathis, William C. Wallace, Taylor Hawes, Boyle Engineering Corporation
Title
Prehearing Statement of Colorado River Water Conservation District
Water Supply Pro - Doc Type
Court Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHI8IT B <br />CRWCD'S PREHEARING <br />STATEMENT <br />(SILVERTHORNE RICD) <br />Phase II Upper Colorado River Study <br />Executive Summary <br />i. lntroducfion <br />The Upper Colorado River Basin Study (UPCO) was initiated in 1998 to identify and <br />investigate water quantity and quality issues in the Study Area consisting of Grand and <br />Summit Countiesl. The primary goal of Phase II of UPCO was to develop the <br />information and analytical tools necessary to understand existing hydrology and water <br />quality conditions in the study area and how increased water diversions may impact those <br />conditions. This information was meant to support discussions and negotiations between <br />the stakeholders as they seek solutions to current and future water supply, reservoir level, <br />instream flow, and water quality issues. Participants in the study were Grand and <br />Summit Counties, Colorado River Water Conservation District (River District), Middle <br />Park Water Conservancy District (Middle Park), Northwest Colorado Council of <br />Government's Water Quality and Quantity Committee (QQ), Northern Colorado Water <br />Conservancy District (Northern), Denver Water (Denver) and Colorado Springs. <br />The principal components of the Phase II study were: 1) compilation and analysis of <br />water resources and water supply data for Summit and Grand Counties; 2) expansion of <br />Denver's hydrologic and water rights model (Platte and Colorado Simulation Model, <br />PACSM) to represent individual West Slope water supply systems; 3) development of a <br />data management and display tool to support the analysis of impacts associated with <br />existing and future water supply and demand scenarios; and, 4) identification of issues to <br />be addressed in Phase III, the solutions phase, of the study. <br />The study analyzed existing and future conditions based on the 1947-1991 hydrologic <br />record. That is, the model used natural or "undepleted" stream flows for those years and <br />accounted for the operation of water rights and demands to predict quantity and timing of <br />water supplies, the depleted stream flows, and reservoir levels under various assumptions <br />for the demands. The 1947-1991 period includes wet, dry and average years but does not <br />include any years that are comparable to drought conditions- as severe as what occurred <br />during 2002 when streamflows in many areas were the lowest ever recorded. Impacts <br />created by the 2002 drought are discussed in more detail on page 8. <br />The UPCO evaluations indicate a need for additional water supplies in Grand and <br />Summit Counties for existing and future municipal demands as well as instream flows to <br />support the area's recreational uses and maintain low-flow levels used to determine waste <br />load allocations for wastewater treatment plants. Most pressing are additional supplies <br />for the Fraser River, Upper Blue River (i.e., above Dillon Reservoir), the Snake River, <br />I Phase l of UPCO was the development of the Scope of Work for Phase 11. Phase 111, to be initiated in mid-2003, <br />involves a collaborative effort by the participating parties to seek solutions to the issues identified in the Phase 11 study <br />report. <br />Hydrosphere Resource Consultants
The URL can be used to link to this page
Your browser does not support the video tag.