My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Prehearing Statement of the Town of Silverton
CWCB
>
Water Supply Protection
>
DayForward
>
3001-4000
>
Prehearing Statement of the Town of Silverton
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:41:25 PM
Creation date
7/27/2009 10:35:15 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8230.51A1a
Description
Applicant's Prehearing Statements: Legal Documents
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
6/6/2005
Author
David W. Robbins, Mark J. Wagner
Title
Prehearing Statement of the Town of Silverton
Water Supply Pro - Doc Type
Court Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Leo M. Eisel, Ph.D., P.E. <br />• Operation Study of Ruedi Reservoir, Exxon Company, Colorado <br />ProjectManager. Developed a model for an operations study of Ruedi <br />Reservoir. Analyzed the unpact of reservoir releases for Battlement Mesa <br />and the Colony Shale Oil pxoject, on ininimum flows in the Coloxado River. <br />Reservoir Feasibility Study, Exxon Company, White River Basin, Colorado <br />ProjectManager. Served as project manager for feasibility-level investigations <br />for two reservoir sites including pumping plants and pipelines. Work <br />included development of spillway design floods, pxeliminary spillway design, <br />cost estimates, highway relocation, and pipeline/pumping station <br />preluninary design. <br />Irrigation Reservoir Rehabilitation, Private Client, Larkspur, Colorado <br />ProjectManager. Served as project managex on project to xehabilitate a 50- <br />acxe-foot isrigarion dam and reservoir near Laxkspur, Colorado. Project <br />involved design of new spillway, new drain system for dam, and general <br />rehabilitation of dam. <br />Reservoir Site Investigation, Exxon Company, Illinois <br />ProjectManager. Served as project managex fox reservoir site investigation in <br />Illinois. Ptoject involved engineering and economic feasibility <br />detenninations fox industrial water supply storage. <br />• Reservoir Operations Study, Salmon Falls Canal Company, Idaho <br />Pmject Manager. Conducted hydraulic analysis of an outlet structure fxom the <br />Salxnon Falls Dam and Reservoir to determine opexating chaxacteristics <br />during flood xeleases. An operations plan for the reservoir was completed. <br />Dam Rehabilitation Study, Rocky Mountain Rail Car Incorporated, Hudson, <br />Colorado <br />ProjectManager. A feasibility analysis fox dam rehabilitation and an <br />augmentation plan were completed for this faciliry. <br />Reservoir Enlargement Study, City of Idaho Springs, Colorado <br />Pmject Manager. Performed feasibility analysis of rehabilitating ox enlarging <br />Idaho Springs Reservoir on Chicago Creek. <br />Flood Hazard Mitigation <br />South/Centra! Platte River Flood Control Project, Urban Drainage and Flood <br />Control District, Denver, Colorado <br />Principal-in-Charge. Issued final design for a flood control project on the <br />South Platte and Central Platte Rivexs. Project requixed design of a flood <br />control featuxe, and diversion structure for cooling water for major a <br />electrical generating facility. <br />Flood Damage Restoration Project, Havasupai Reservation, Arizona <br />ProjectManager. Engineered restoration projects to address flood damage for <br />• the Havasupai reservation in noxthern 1lxizona. Completed plans, designs, <br />12 <br />C:\Documenfs and Settlngs\mark.wagnerLLocalSettings\Temporary Internet Files10LK110sel_Leo.dac
The URL can be used to link to this page
Your browser does not support the video tag.