My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Estimating Additional Water Yield from Changes in Management
CWCB
>
Water Supply Protection
>
DayForward
>
2001-3000
>
Estimating Additional Water Yield from Changes in Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:41:08 PM
Creation date
7/22/2009 12:50:22 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.250
Description
Water Issues
State
CO
Basin
South Platte
Water Division
1
Date
5/12/2000
Author
Charles A. Troendle, James M. Nankervis
Title
Estimating Additional Water Yield from Changes in Management
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
One of the more significant issues regarding water yield augmentation is the <br />limited experience we have in applying research based technology at the <br />landscape level in forest and wild land management. The last formal <br />assessment of the potential for water yield augmentation through forest and <br />range management was by the American Water Resources Association in the <br />early 1980's (Ponce 1983). Douglass (1983), Harr (1983), Kattelman et al. <br />(1983), and Troendle (1983) presented regional summaries of the <br />opporiunity to increase water yield through forest management based on <br />what was ca 1980's technology. In a summary manuscript, Ponce and <br />Meiman (1983) concluded that the opportunity to augment water yield <br />through timber harvest, as a large-scale land management program, may not <br />be as great as would be implied based on small research watershed results <br />because of the diversity of land ownership patterns and the conflicring <br />physical, biological, and administrative constraints associated with <br />implementation of the technology. <br />However, because of the limited supply and high value of water in the <br />Rocky Mountain West, interest arose in the early 1980's in demonstrating <br />that the water yield augmentation technology, demonstrated to work on <br />:'.F... <br />small-scale experimental watersheds, such as Fool Creek and Deadhorse <br />- Creek on the Fraser Experimental Forest, could be applied at an operarional <br />or landscape scale by forest managers and yield similar results. <br />The impetus for the project came from the Regional Forester (USFS), <br />Region 2, whose objective was to develop a water yield augmentation <br />initiative in the Rocky Mountain Region that would demonstrate an <br />operational application of what was then current research technology. A <br />necessity was to find a significantly large area to demonstrate that research <br />results from small watershed experiments could be extrapolated to the <br />operational level while involving a range of users and interest groups during <br />implementation. Coon Creek was selected as the project area primarily <br />because the watershed in which it is located, the East Fork of Encampment <br />River, was a large, uncut, and non-roaded watershed of the size necessary <br />for evaluating the hydrologic impacts of a commercially viable timber sale. <br />The basin consists of two contiguous watersheds of comparable size, aspect, <br />and timber types, allowing a paired watershed study. The treatment <br />watershed, Coon Creek, could be logged by convenrional harvesting <br />methods using standard silvicultural practices (small clear cuts) of the times. <br />14
The URL can be used to link to this page
Your browser does not support the video tag.