My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150269 Letter of Substaintial Compeltion
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150269 Letter of Substaintial Compeltion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2011 10:20:31 AM
Creation date
7/15/2009 4:02:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150269
Contractor Name
San Luis Valley Water Conservancy District
Contract Type
Loan
Water District
0
County
Alamosa
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT CHECKLIST: SAN LUIS VALLEY WATER CONSERVANCY DISTRICT (C1502C9~ <br /> Pre Construction Post Construction <br />DATE 12/17/08 5/12/09 <br /> Tim Feehan, Vaughn McWilliams, Tim Feehan, Vaughn McWilliams, <br />ATTENDEES Steve Biondo Steve Biondo <br /> Pro'ect Mana er - Tim Feehan Pro'ect Mana er - Tim Feehan <br />BORROWER San Luis Valley Water Conservancy District <br /> <br />PROJECT Water rights acquisition of Pine River Weminuche Pass Ditch <br />CoNTR~-CT NO. C150269 <br /> Authorized Loan Amount =$727,200 @3.5%, for 30 years w/LSF = <br />LOAN TERMS $7,200. Final Loan Amount =$727,200 @3.5% for 30-years w/LSF = <br /> $7,200 <br />BORROWER'S CERTIFICATE OF INSURANCE On-file <br />CONTRACTOR'S CERTIFICATE OF INSURANCE N/A <br /> Start - 12/08 <br />CONSTRUCTION SCHEDULE <br /> Finish - 2/09 <br />ELEC7RONIC FUND TRANSFER Y@S <br />REPAYMENT SCHEDULE Initial - Yes <br /> Final - Yes <br />CONTRACT REQUIREMENTS PRIOR TO Need lease agreement for water storage - on file, dated 10/08 <br />DISBURSEMENT OF FUNDS OR UPON <br />SUBSTANTIAL COMPLETION <br />DISTRIBUTION OF CONTRACT AT X Borrower <br />PRE-CONSTRUCTION MEETING X CWCB Project Manager <br /> X CWCB Contract File <br />DATE OF SUBSTANTIAL COMPLETION 5/1/09 <br /> X Borrower <br />DISTRIBUTE SUBSTANTIAL COMPLETION X CWCB Project Manager <br />LETTER AT POST CONSTRUCTION MEETING <br /> X CWCB Contract File <br /> X CWCB Contract Mana er <br />Nores <br />L:\Section Folders\SECB\Old Structure\PROJECTS\SanLuisVllyWCD C150269-proj checklist.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.