My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150269 Letter of Substaintial Compeltion
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150269 Letter of Substaintial Compeltion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2011 10:20:31 AM
Creation date
7/15/2009 4:02:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150269
Contractor Name
San Luis Valley Water Conservancy District
Contract Type
Loan
Water District
0
County
Alamosa
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROMISSORY NOTE <br />Date: October 10, 2008 <br />Borrower: San Luis Valley Water Conservancy District, acting by and <br />through its Water Activity Enterprise <br />Principal Amount: $727,200 <br />Interest Rate: 3.5% per annum <br />Term of Repayment: 30 years <br />Loan Contract No.: C150269, dated October 10, 2008 <br />Loan Payment: $39,538.83 <br />Payment Initiation Date*: __~c~y / . ? 04 ~ <br />Maturity Date": 1'l~L _ 2 D 3~ <br />'' Payment Initiation Date and Maturity Date fields are filled in after the project has been <br />substantially completed. <br />'I. FOR VALUE RECEIVED, the BORROWER promises to pay the Colorado Water Conservation <br />Board ("CWCB"), the Principai Amount plus Interest for the Term of Repayment, pursuant to <br />the LoAN CoNrw~cr and this promissory note. <br />2. Principal and interest shall be payable in equal Loan Payments, with the first payment due and <br />payable one year from Payment Initiation Date (the date the CWCB determines that the <br />project is substantially complete), and annually thereafter. All principal, interest, and late <br />charges, if any, then remaining unpaid shall be due and payable on or before the Maturity <br />Date. <br />3. Payments shall be made to the Colorado Water Conservation Board at 1313 Sherman Street, <br />Room 721, Denver, Colorado 80203. <br />4. The CWCB rnay impose a late charge in the amount of 5% of the annual payment if the <br />CWCB does not receive the annual payment within 15 calendar days of the due date. <br />5. This Note may be prepaid in whole or in part at any time without premium or penalty. Any <br />partial prepayment shall not postpone the due date of any subsequent payments or change <br />the amount of such payments. <br />6. All payments received shall be applied first to late charges, if any, next to accrued interest and <br />then to reduce the principal amount. <br />7. This Note is issued pursuant to the LoArv CoNTwacT between the CWCB and the BoRROwER. <br />Appendix 2 to Loan Contract C150269 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.