My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EA Update
CWCB
>
Water Supply Protection
>
DayForward
>
2001-3000
>
EA Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:39:38 PM
Creation date
6/25/2009 11:08:27 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.450
Description
EAC/RCC Meetings
State
CO
Basin
South Platte
Water Division
1
Date
4/7/2003
Author
Sharon B. Whitmore
Title
EA Update
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Wa.ter 't'ear 2002 EA Releases <br />Date s Amount Comments <br />6-01-02 300 cfs Began EA releases to maintain an initial goal of z500 cfs in the river at the Grand <br />Island gage to mai.ntain a healthy aquat:ic community (i.e., :Eish and invertebrates)/ <br />forage base for terns and plovers. <br />6-14-02 0 cfs EA releases, were terminated due to hycirocycling pattern of EA water returned at J- <br />2. Service biologxsts believe that the hydrocycling pattern of EA flows may be <br />nullifying anticipated benefits from flow augmentation ancl negatively impacting <br />the fish and macroinvertebrate communities. <br />6-21-02 300 cfs Started rele,ases again, when flatloading at the Johnson hyalro facilitywas possible <br />and EA wat:er woixld be returned to the river at the J-2 return at a constant level. <br />6-27-02 400 cfs 300 cfs was, not m.aintaining flows at a desired level at Grand Island. <br />6-28-02 500 cfs 400 cfs was, not m.aintaining flows at a desired level at Grand Island. <br />6-29-02 600 cfs 500 cfs was, not m.aintaining flows at a desired level at Grand Island. <br />7-05-02 550 cfs CNPPID started decreasing EA releases due to proximity to flood stage at North <br />Platte. <br />7-06-02 500 cfs See comment above. <br />7-09-02 600 cfs Increased re;leases again to improve the level of augmentation for aquatic <br />community health and tern/plover forage base. <br />7-13-02 550 cfs CNPPID star-ted decreasing EA releases due to proximity to flood stage at North <br />Platte. <br />7-14-02 500 cfs See comment above. <br />7-26-02 300 cfs The third aiid fina.l survey of the 2002 tern and plover nesting season in the central <br />Platte was c;ompleted on July 23. Because the majority of birds were done nesting <br />and most chicks fledged, and the quantity of water in the E;A was not sufficient to <br />continue au.gmentation throughout the remainder of the irrigation season, "Carry <br />Over" was ;prioritized. Termination of EA releases was initiated. <br />7-27-02 100 cfs See comme:nt above. <br />7-28-02 0 cfs See comme;nt above. <br />8
The URL can be used to link to this page
Your browser does not support the video tag.