My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Summary of Monitoring and Research at Cottonwood Ranch
CWCB
>
Water Supply Protection
>
DayForward
>
2001-3000
>
Summary of Monitoring and Research at Cottonwood Ranch
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:39:31 PM
Creation date
6/25/2009 9:10:34 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.300
Description
Land Issues
State
CO
Basin
South Platte
Water Division
1
Date
1/10/2002
Author
Paul Kinzel, Randy Parker
Title
Summary of Monitoring and Research at Cottonwood Ranch
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />w <br />Fiscal Year 2001 Expenditures <br />(All figures in rounded gross doilars) <br />Data Coilection I Analysis <br />II. Cross sections, bed material sampling, and ground photography <br />a. Spatial sections (57 sections,1 time) Survey, sampl ing and photography (Completed 9/21 -10/19/00) <br />Field Labor 7 persons 356 hours <br />Travel / Per Diem 7 persons 41 days <br />Vehicles 2 vehicles 1440 miles <br />Supplies (Although listed here, supplies purchased were used in spatial, temporal and general data collection activities) <br /> wood stakes 3 pkgs (50 stakes/pkg) <br /> sample bags 10 pkgs (100 bags/pkg) <br /> flagging 1 pkg (12 rolls/pkg) <br /> film 20 rolls <br /> developing 20 rolls <br /> waders 2 sets <br />Office Labor <br /> Supplies <br />Laboratory Labor <br />Subtotal <br />b. Temporal sections (8 sections, 2 times) <br />Field Labor <br /> Travel / Per Diem <br /> Vehicles <br />Office Labor <br />Laboratory Labor <br />Subtotal <br />1 person 120 hours <br />storage media <br />2 persons 600 hours <br />Survey, sampling and photography (Completed 5/1 -5/3/01 and 7/22 -7/24l01) <br />3 persons 168 hours <br />3 persons 18 days <br />1 vehiGe 1440 miles <br />1 person 120 hours <br />1 person 400 hours <br />Actual PRESP <br />USGS Budgeted <br />Cost Cost <br />$16,950 $15,400 <br />$4,979 <br />$1,033 <br />$60 <br />$500 <br />$10 <br />$160 <br />$400 <br />$200 <br />$4,872 <br />$100 <br />$9,685 $9,060 <br />$38,949 $24,460 <br />$6,820 $15,400 <br />$2,186 <br />$1,033 <br />$4,872 <br />$6,457 $5,750 <br />$21,368 $21,150
The URL can be used to link to this page
Your browser does not support the video tag.