My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Proposal for Monitoring and Research Demonstration (2)
CWCB
>
Water Supply Protection
>
DayForward
>
2001-3000
>
Proposal for Monitoring and Research Demonstration (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:39:30 PM
Creation date
6/24/2009 2:08:26 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.300
Description
Land Issues
State
CO
Basin
South Platte
Water Division
1
Date
4/13/2000
Author
Technical Committee
Title
Proposal for Monitoring and Research Demonstration
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
samples will be analyzed using standard field and laboratory techniques (Edwards and Glysson, <br />1988 and Guy, 1969). <br />Proposed Products of Monitoring <br />The data will be compiled following each re-measurement and a comparative analysis <br />summazizing the observed changes in the over time will be annually provided to the Technical <br />Committee. This information will be provided to NPPD for consideration in permit reports, and <br />compiled into data pages on an existing Internet site. <br />Proposed Monitoring Budget Snmmary <br />The Cooperative Agreement and Program would wholly fund this project. Costs are <br />approximate and may be altered somewhat depending on contractor. <br />Category Project Cost <br />Survey/analysis cross sections <br />Including lab costs <br />$2,600/ average per cross section $20,800 <br />Equipment, Maintenance <br />& Supplies <br />including: <br />Photography Supplies, <br />Survey Supplies, <br />Sampling Supplies, $2,200 <br />Data Report on Internet $2,000 <br />Total lg` Year Cost Including Overhead $25,000 <br />Anticipated 2"d year cost $25,000 <br />Anticipated 3rd year cost $25,000 <br />Total Project Cost $75,000 <br />Page 4 of 15
The URL can be used to link to this page
Your browser does not support the video tag.