Laserfiche WebLink
i ? <br />APPENDIX G- Figure 8. Flow Duration, July 1- August 19, 2007 at Overton Gage <br />? <br />Platte River Near Overton, NE <br />July 1- August 19 <br />2,000 <br />1,800 <br />1 <br />600 --!ftA4 <br />, ? <br />1,400 <br />? <br />? <br />c <br />? 1,200 <br />? <br />R <br />L <br />C? <br />1,000 <br />0 <br />21 <br />.r <br />? 800 <br />c <br />e? <br />m <br />2 <br />600 <br /> <br />400 <br /> <br />200 <br /> <br /> <br />0 <br /> <br />0 10 20 30 40 50 60 70 80 90 100 <br />Percent of Time Discharge Equalled or 6cceeded <br />2002 2003 2004 2005 2006 2007 s 2007 w/o EA <br />Water Year 2008 EA AOP 49 October 15, 2007