My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP Governance Committee Meeting and Materials
CWCB
>
Water Supply Protection
>
DayForward
>
2001-3000
>
PRRIP Governance Committee Meeting and Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:39:13 PM
Creation date
6/22/2009 12:27:36 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.750
Description
Governance Committee
State
CO
Basin
South Platte
Water Division
1
Author
PRRIP
Title
PRRIP Governance Committee Meeting and Materials
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• • <br />• <br />Table 2. Release Priorities for the Environmental Account for the Water Year 2008 (The nvo pulseflow periods are shaded.) <br />Carry"Over N/A Use of EA water for beneficial PurPoses as Considering EA volume, Pulse flow augmentation <br /> described for other time periods. needs, and the Platte River Program beg'mning in <br /> January 2007, retaining EA water for carry-over <br /> purposes is given a medium priority. As the water <br /> year progresses, hydrologic conditions, EA volume, <br /> reservoir levels, and species/habitat needs will be <br /> closely monitored to determine how much water can <br /> or should be retained in Lake McConaughy for carry- <br /> over purposes. <br />* During May 1- June 30, high priority pulse flow requirements overlie the flows for species-specific physical aquatic habitat. May and June recovery flow targets are <br />designed to capture natural variability: a 10-year nunn;ng average with a 30-consecutive-day exceedance of 3,400 cfs, and a 5-consecutive-day peak flow exceedance of 8,300- <br />10,500 cfs. Within this broad goal there are further recommendafions that certain flow levels be achieved with specific frequencies (see Bowman and Carlson et al. 1994). <br />* The 5-day peak flow with ramped rate of rise and decline may occur in either February-March or May-June. <br />Water Year 2008 EA AOP 18 October 15, 2007
The URL can be used to link to this page
Your browser does not support the video tag.