My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150293 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150293 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2011 10:57:35 AM
Creation date
6/18/2009 8:45:11 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150293
Contractor Name
North Sterling Irrigation District
Contract Type
Loan
Water District
0
County
Logan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEPAR'T~vIENT OF NATURAL RESOURCES <br />May 1, 2009 <br />MAY - 9 2009 <br />Colorado Water <br />Conserv~tion eoard <br />Mr. Jim Ferentchak, P.E. <br />W. W. Wheeler and Associates, Inc. <br />3700 South Inca Street <br />Englewood, CO 80110 <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Exeeutive Direetor <br />Dick Wolfe, P.E. <br />Director <br />When replying, please refer to: <br />POINT OF ROCKS DAM <br />a.k.a North Sterling Dam <br />Construction File No.: C-0489C <br />Water Division 1~ Water District 64 <br />DAMID: 640701 <br />Subject: Acceptance of Design and Construction Documents for the <br />Point of Rocks Dam and Spillway Improvements <br />Dear Mr. Ferentchak: <br />Thank you for submitting for the review and approval of the State Engineer the plans and <br />specifications for the construction of the dam and spillway improvements at Point of Rocks Dam in <br />Logan County. We have completed our review of the design and construction documents and have <br />found them to be acceptable for construction as of the date of this letter. We are transmitting the <br />fol{owing: <br />• Two copies of the construction specifications. <br />• One mylar cover sheet and one copy construction drawings with approval signatures for <br />the construction of this project under separate cover. <br />The construction of this project must be performed under the purview of a professional <br />engineer registered in the State of Colorado. Your attention is directed to Rule 9(copy enclosed) of <br />the Rules and Regulations for Dam Safefy and dam Construction (Rules and Regulations) concerning <br />construction observations, coordination and documentation activities required for this Large Size, <br />High Hazard dam. Please keep Mr. Paul Perri of our Denver office (303) 866-3581 ext. 8274 <br />informed of the construction status so that he may meet his obligations under Rule 9. <br />Office of the State Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 ~ Phone: 303-866-3581 ~ Fax: 303-866-3589 <br />DIVISION OF WATER RESOURCES <br />RECEIVED <br />www.water.state.co.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.