My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150293 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150293 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2011 10:57:35 AM
Creation date
6/18/2009 8:45:11 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150293
Contractor Name
North Sterling Irrigation District
Contract Type
Loan
Water District
0
County
Logan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Construction Fund Loan Application <br />6. Will the acquisition of additional water rights be necessary? YES NO X <br />If YES, please explain. <br />7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and <br />attorney(s). <br />NAME <br />.~OUMeS ~ere.t~c~a~ <br />~eJi il~il~i0uM.5ov~ A <br />~ 8c7~1 <br />- ~zz- z~-f <br />8. List any feasibility studies or ot~er investigations that have been completed or are now in <br />progress for the proposed project. Please subm.it one copy af each completed stuciy with this <br />applica.rion. ~~ s G~ ~AI~ ca'~; e r~ i s nC~r-~ o~ ~- -~ct5i b~ (~~-./ 5'tU~~/ ° a1So e~~-~ <br />~re d.es~c~K re,~o~-~ a~+.d. -~-~k.~.~~r,~' ~p~~~~~-~o.~.S. <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, if l~own. <br />Estimatsd Engineering Costs: $ -- <br />Estimated Construction Costs: $ I~ 7~ ~~-St~ <br />EStiIriRted OthB[' COSts: $ (land acquisition, water rights punchase,ex.) <br />Estimated Total Costs: $ i~ Z~ ~, 4-S[`~ <br />10. Loan amount and terms you are requesting. <br />Requesteii Loan Amount: <br />Term (length) of loan: <br />Interest Rate: <br />$ 1,D84~DOS <br />2-~ VP~I'S <br />2. 2 S % <br />Part C. - Project Sponsor ~nancial Information <br />(Niaximum 75-90 % of Est. Total Cosls) <br />~~uy io, 20, or 3o y~> <br />(Please cau for onr cunent rates> <br />Because the CWCB Construction Fund is a revolving fimd, it is imprntant that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The following information is <br />needed to assist the CWCB in a prelimi.nary assessment of the applicant's financial capaciry. It is <br />also requested that the project sponsor submit witb this application, copies of the three most recent <br />annual reports, financial statements, corporate reports or other current documentation of finaucial <br />condition and opaations. <br />ADDRESS and PHONE <br />'~/ ~n/ ~nl ~~l~.r -F ~ssor: "3 `7ao ( nc~~ 5 + .Erw ~~ ~.~>rrad Le~ ~34 t c !~ <br />~ ~~'~-- °~bl -~t~a <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.