Laserfiche WebLink
List of Appendices <br />Appendix A: Order Creating North Sterling Irrigation District <br />Appendix B: ~greement between Point of Rocks Water Company and <br />Xcel Energy <br />Appendix C: Water Rights Summary & System Specifications <br />Appendix D: SEO Design Response Lefter <br />Appendix E: Financial Statements for 2007 and 2008 <br />And 2009 Budget <br />Appendix F: CWCB Loan Application <br />Attachment: Spillway Design Report <br />Ptan Drawings and Specifications <br />North Sterling Irrigation District Page 3 of 13 <br />Dam Crest and Spillway Improvement Feasibility Study <br />March 1, 2009 <br />