Laserfiche WebLink
Feasibility of Construction <br />of the <br />North Sterling Reservoir <br />Dam and Spillway Improvement <br />Project <br />Sponsored by: <br />North Sterling Irrigation District <br />in conjunction with the <br />Colorado Water Conservation Board <br />F~ASIBILITY S7UDY APPROVAL <br />Pursuant to Colorado Ravised Statutes 37-60-121 &122, and <br />in accordance with poliaes adopted by tl~e Bqard, the <br />CWCB staff has detertningd this Feasibility Study meets all <br />appllcable requirements for approval. <br />Prepared by: ~ <br />Signed Da <br />James T. Yahn, P.E. <br />Manager af North Sterling Irrigation District <br />P.O. Box 103 <br />Sterling, Colorado 80751 <br />March 2009 <br />