My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150292 Deauth Ltr
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150292 Deauth Ltr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2010 9:54:23 AM
Creation date
6/18/2009 8:44:23 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150292
Contractor Name
Huerfano-Cucharas Irrigation Company
Contract Type
Loan
Water District
0
County
Pueblo
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Huerfano-Cucharas Irrigation Company <br />May 12, 2009 (UPDATED May 22, 2009) <br />Page 5 of 7 <br />This Project will include the following items: <br />Agenda Item 17h <br />1. A hydrologic model will be developed to determine at what elevation the lowered <br />spillway can safely pass the inflow design flood with adequate freeboard. <br />2. An analysis will be completed to determine if there are structural concerns relating to the <br />proposed Reservoir storage level. <br />3. Plans and specifications will be developed for lowering the existing spillway. <br />4. A dam break model and dam break inundation map will be developed to verify the dam <br />hazard class based on the reduced Reservoir storage level and for use in the updated <br />Emergency Action Plan. <br />5. Replacement of the two 30-inch diameter outlet gates. <br />6. A monitoring program will be implemented that will transmit data (weather information, <br />inflow, outflow, Reservoir level, and seepage measurement) at regulaz intervals via the <br />SEO satellite monitoring system. <br />7. An updated Emergency Action Plan will be developed for the newly configured <br />dam and Reservoir. <br />$. The irrigation delivery system will also be updated with new gates and repair on the <br />river diversion <br />Table 2. Cost Estimate <br />Engineering $265,000 <br />Construction <br />Spillway Modifications $225,000 <br />Sluice Gate Replacement $160,000 <br />Stability/Seepage Control Berm $358,000 <br />Monitoring and Instrumentation $115,000 <br />Irrigation System Improvements $160,000 <br />� Mobilization $64,000 <br />Construction Observation $64,000 <br />Testing $26,000 <br />Survey $26,000 <br />Contingency $321,000 <br />TOTAL $1,784,000 <br />Pending SEO plan approval, Project construction is expected to begin during the winter of <br />2009/2010. <br />
The URL can be used to link to this page
Your browser does not support the video tag.