My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150290 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150290 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:19:09 PM
Creation date
6/18/2009 8:43:05 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-030
C150290
Contractor Name
Joseph W. Bowles Reservoir Company
Contract Type
Loan
Water District
0
County
Jefferson
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Construction Fund Loan Application <br />so that the full storage canacitv of Bowles No. 1 Reservoir is preserved. In addition. the <br />deteriorating Bowles Ditch will be rehabilitated to re~ain its full capacitv. The main <br />tvpe of water use is for irri~ation of shareholders' nropertv which includes narks, golf <br />courses and qasture land. <br />6. Will the acquisition of additional water rights be necessary? YES NO _ X <br />If YES, please explain. <br />7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and <br />attorney(s). <br />NAME <br />ADDRESS and PHONE <br />Jim Ferentchak, P.E. 3700 S. Inca Street, Englewood. CO 80110 (303)-761-4130 <br />Julia Robinson. Esq. 4430 AraAahoe Ave.. #155, Boulder, CO 80303 (303)-442-6036 <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. See enclosure <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, if known. <br />Estimated Engineering Costs: $ 235,000 <br />Estimated Construction Costs: $ 1,561,000 <br />Estimated Other Costs: $ 7g.00~ (land acquisition, water rights purchase,etc.) <br />Estimated Total Costs: $1,874,000 <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $JL686,600 (Ma~cimum 75-90 % of Est. Total Costs) <br />Term (length) of loan: 30 ~ST'S (Usually 10, 20, or 3o y~> <br />Interest Rate: 4.30 % (Please call for our current rates) <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.