My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Adaptive Management Workgroup Tasks
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
Adaptive Management Workgroup Tasks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:38:42 PM
Creation date
6/16/2009 12:33:34 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.100
Description
Adaptive Management Workgroup
State
CO
Basin
South Platte
Water Division
1
Author
PRRIP
Title
Adaptive Management Workgroup Tasks
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Respons ble <br />Tasks Par Timeline Comments <br />2007 Annuai Work Plan - AMWG <br />meeting to identify the components, <br />identify scope of the annual work plan, AMWG Nov-06 This will guide the 2007 work plan <br />define the products, better define what development <br />the wark plan and experimental design <br />will entail <br />AMWG meeting to integrate the This would guide interim baseline <br />baseline monitoring with the IMRP AMWG Dec-06 monitoring needs for early in the <br /> Pro ram <br />Identify basic baseline monitoring needs Examples of baseline monitoring <br />for 2007 AMWG 2007 needs include: Lidar, species use, and <br /> vegetationlgeomo holo y. <br />Develop broad experimental design <br />recommendations to GC from AMWG AMWG, Through This will be one voice among many <br />(what management actions are TAC <br />LA , December influencing which management <br />recommended to test priority , <br />WAC, ED 2007 actions the GC decides to implement <br />hypotheses, what is timeline, where to <br />implement management actions?) <br /> Through <br />In parallel, work on 5-year workplan AMWG December Work plan tiers from the AMP <br /> 2008 <br />In parallel, conduct analysis and get AMWG Through <br />outside expertise to help address work <br />ot ers <br />?ides <br />December Potential need for outside expert , <br />plan and experimental design feasibility , <br />participate <br />2008 assistance <br />issues
The URL can be used to link to this page
Your browser does not support the video tag.