My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP FY 2008 Budget and Annual Work Plan
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
PRRIP FY 2008 Budget and Annual Work Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:38:42 PM
Creation date
6/16/2009 12:29:09 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.150
Description
Finance
State
CO
Basin
South Platte
Water Division
1
Date
2/2/2008
Author
PRRIP Executive Director's Office
Title
PRRIP FY 2008 Budget and Annual Work Plan
Water Supply Pro - Doc Type
Budget
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PRRIP - ED QFFICE FINAL <br />i <br />• <br />PROGRAM TASK & ID: PS-2. <br />(Year 1 of 3) <br />Program First Increment Timeline <br />2008-2009 <br />FY 2008 Start Date <br />March l, 2008 <br />FY 2008 End Date <br />December 31, 2008 <br />Task Completed by <br />Contractor <br />Task Location <br />Lower Platte River, NE <br />Task Description <br />Contractor should develop a protocol to generE <br />in river stage in the lower Platte River over a r; <br />protocol should provide information on the nef <br />discharge/stage measurement intervals necessa <br />the efficacy of applying these methods over a 1 <br />the GC and then contractor will implement the <br />Platte River Stage Change Study <br />sufficient data to evaluate the effect of changes <br />;e of flows on a micro, meso, and macro scale; <br />;d methods to obtain this data, the appropriate <br />for achieving the desired level of precision, and <br />ger range of flows; protocol will be approved by <br />Linkage to Priority Hypotheses in AMP <br />Link to all pallid sturgeon hypotheses. <br />Products <br />Final protocol; field and model work in 2008 <br />Notes on Cost <br />Potential for three-year study; cost for Year 1 <br />2009; final report with data analysis in 2009 <br />Y. <br />Budget <br />??R 1J ?NFT1}J -?f??Jl?.-?? ? • • ?? n' # .. ? f' e?' ? 'YiY • ?,? ? ? €? ai's?'. i -? h ?. <br />- .. <br />-,vs a <br />' _ .. . 200 / 2008 <br />Lower Platte River Stage Change Study (Year <br />1 of 3) $200,000 $200,000 <br />0
The URL can be used to link to this page
Your browser does not support the video tag.