My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP FY 2008 Budget and Annual Work Plan
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
PRRIP FY 2008 Budget and Annual Work Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:38:42 PM
Creation date
6/16/2009 12:29:09 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.150
Description
Finance
State
CO
Basin
South Platte
Water Division
1
Date
2/2/2008
Author
PRRIP Executive Director's Office
Title
PRRIP FY 2008 Budget and Annual Work Plan
Water Supply Pro - Doc Type
Budget
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PRRIP - ED C'FFICE FINAL <br />s <br />• <br />PROGRAM TASK & ID: WP-3. Test Flow Routing Model/2008 EA <br />Augmented Pulse Flow Pilot Study <br />Program First Increment Timeline <br />Completed in 2008 <br />FY 2008 Start Date <br />March 1, 2008 <br />FY 2008 End Date <br />May 31, 2008 <br />Task Completed by <br />ED Office; Program partners; USGS <br />Task Location <br />Kingsley Dam through affected reach to <br />Task Description <br />Track pulse flow magnitude and timing from L, <br />and compare to flows modeled in the Unsteady <br />the associated habitats and compare to modeled <br />model; determine if the Unsteady Flow and SEI <br />model higher pulse flow events; track the travel <br />Linkage to Priority Hypotheses in AMP <br />Key component of Program to test flow-related 1 <br />Flow #1, #345; Mechanical #2. <br />NE <br />McConaughy through the associated habitats <br />w Model; measure water surface elevation in <br />ter surface elevations in the SEDVEG Gen3 <br />--G Gen3 models are sufficiently accurate to <br />ie of the leading edge of the pulse flow. <br />; linked to numerous hypotheses - <br />Products <br />Flow monitoring report <br />Notes on Cost <br />Need to determine the staffing requirements to <br />the pulse flow monitoring effort. <br />Budget <br />, <br />W,P . <br />, 2007 2008 <br />Test Flow Routing Model/2008 EA <br />Augmented Pulse Flow Pilot Study $75,000 $250,000 <br />0
The URL can be used to link to this page
Your browser does not support the video tag.