Laserfiche WebLink
PRRIP - ED C'FFICE FINAL <br />s <br />• <br />PROGRAM TASK & ID: WP-3. Test Flow Routing Model/2008 EA <br />Augmented Pulse Flow Pilot Study <br />Program First Increment Timeline <br />Completed in 2008 <br />FY 2008 Start Date <br />March 1, 2008 <br />FY 2008 End Date <br />May 31, 2008 <br />Task Completed by <br />ED Office; Program partners; USGS <br />Task Location <br />Kingsley Dam through affected reach to <br />Task Description <br />Track pulse flow magnitude and timing from L, <br />and compare to flows modeled in the Unsteady <br />the associated habitats and compare to modeled <br />model; determine if the Unsteady Flow and SEI <br />model higher pulse flow events; track the travel <br />Linkage to Priority Hypotheses in AMP <br />Key component of Program to test flow-related 1 <br />Flow #1, #345; Mechanical #2. <br />NE <br />McConaughy through the associated habitats <br />w Model; measure water surface elevation in <br />ter surface elevations in the SEDVEG Gen3 <br />--G Gen3 models are sufficiently accurate to <br />ie of the leading edge of the pulse flow. <br />; linked to numerous hypotheses - <br />Products <br />Flow monitoring report <br />Notes on Cost <br />Need to determine the staffing requirements to <br />the pulse flow monitoring effort. <br />Budget <br />, <br />W,P . <br />, 2007 2008 <br />Test Flow Routing Model/2008 EA <br />Augmented Pulse Flow Pilot Study $75,000 $250,000 <br />0