My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SWSI Implementation Update with Attachments
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
SWSI Implementation Update with Attachments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:38:33 PM
Creation date
6/15/2009 2:26:14 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.250
Description
Water Issues
State
CO
Basin
South Platte
Water Division
1
Date
1/20/2004
Author
Rod Kuharich, Rick Brown
Title
SWSI Implementation Update with Attachments
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br />• Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 8664474 <br />www.cwcb.state.co.us <br />MEMORANDUM Bill Owens <br />Govemor <br />Russell G <br />To: Colorado Water Conservation Board eorge <br />Hxecutive Director <br />From: Rod Kuharich, Director Rod xnl,arich <br />Rick Brown, Project Manager, Interstate Stream Protection CWCB Director <br />Dan McAuliffe <br />Date: January 20, 2004 Deputy Director <br />Subject: Agenda Item 25, January 27-28, 2004 Board Meeting, <br />Statewide Water Supply Initiative (SWSn Implementation Update <br />In 3anuary, the Statewide Water Supply Initiative (SWSI) team began the second round of Basin <br />Roundtable Technical (BRT) meetings. The Board will be provided with a summary of some of the <br />information, which is being presented at the second BRT. Attachment 1 outlines the preliminary <br />• municipal/industrial and agricultural demand forecasts developed for the state for both 2000 and <br />short <br />summary of discussions held in the Arkansas and Colorado Basin regarding SWSI's approach to <br />existing planning initiatives and the cataloging of water supply projects that have been identifed by <br />project sponsors or through existing planning initiatives. <br />months the SWSI team will refne the demand estimates and develop water supply estimates, initial which <br />2030The. Board w Attachill bement 2 is a provided with a preliminary draft of presentation the of the water attac supply hed material and methodology. be Oaskver ed the for next few <br />available supply and current and projected demand. <br />can be feedback; used in there is conjnounction decision with item the at dthisemand time. The estimates to Board will determine also whbeere gaps provided may with exaist between <br />• <br />Flood Protection • Water SuppIy Plaiuning and Finance • Stream and Lake Protection <br />Water Supply Protection 9 Conservation and Drought Planning
The URL can be used to link to this page
Your browser does not support the video tag.