My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SWSI Implementation Update
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
SWSI Implementation Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:38:32 PM
Creation date
6/15/2009 2:21:05 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.250
Description
Water Issues
State
CO
Basin
South Platte
Water Division
1
Date
3/26/2003
Author
Rod Kuharich, Rick Brown
Title
SWSI Implementation Update
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, <br />r <br />STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Shermul Street, Room 721 G n,, <br />Denver, Colorado 80203 O?I Fe %J <br />Phone: (303) 866-3441 rr?wr? <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us a /- (MG <br />MEMORANDUM <br />To: Colorado Water Conservation Board <br />From: Rod Kuharich, Director <br />Rick Brown, Project Manager, Interstate Stream Protection <br />Date: March 26, 2003 <br />Subject: Agenda Item 23, March 24-26, 2003 Board Meeting, <br />Statewide Water Supply Initiative (SWSI) Implementation Update <br />Bill Owens <br />Governor <br />Greg E. Walcher <br />Executive Director <br />Rod Kuharich <br />CWCB Director <br />Dan McAuliffe <br />Deputy Director <br />This agenda item is intended to update the CWCB on the implementation of the SWSI. Over the last <br />month CWCB staff and management have meet several times with the selected Consultant, Camp <br />Dresser & McKee, and one of their subcontractors, GBSM to develop a scope of work. We have <br />completed a Draft general scope of work which is attached for your review. We have also meet with <br />the Board's Steering Committee (a.k.a technical committee) and we are currently in the process of <br />developing a detailed scope of work. <br />Given the importance of the project, and our desire to begin work as soon as funds might be <br />available (late April or Early June) we are requesting that the Board approve the Draft general scope <br />in concept, and authorize staff and the Board's Steering Committee to finalize a scope of work. <br />Upon completion of a final scope of work we would then enter into formal contract negotiations, and <br />provided that the terms are acceptable, execute a contract for the work once funds become available. <br />Flood Protection • Water Supply Plaiututg and Finance • Stream and Lake Protection <br />Water Supply Protection • Conservation and Drought Planning
The URL can be used to link to this page
Your browser does not support the video tag.