My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Water Action Plan and Three State Projects Draft
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
Water Action Plan and Three State Projects Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:38:25 PM
Creation date
6/11/2009 3:24:17 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.550
Description
Water Issues
State
CO
Basin
South Platte
Water Division
1
Date
5/3/2000
Author
Platte River EIS Team
Title
Water Action Plan and Three State Projects Draft
Water Supply Pro - Doc Type
Correspondence
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Power Interference <br />(Yield to EA of 5.5 kaf) <br />The OPstudy model was modified to make the operation of the Power Interference Scenario <br />compatible with the analysis done by Boyle. Specifically, excess to FERC requirements is <br />considered during the non-irrigation season, and excess to "system needs" (irrigation, minimum <br />canal flow, etc.) is considered during the irrigation season. Nebraska identified a target yield <br />from this component of 4,000 acre-feet. The potential yield of this component is greater than <br />4,000 acre-feet, and in order to achieve results closer to the target level only a portion of the <br />available power interference volume was reregulated and credited to the Environmental Account. <br />The total amount credited was 5,500 acre-feet and this is assumed to be close to 4,000 acre-feet <br />in "score". <br />Net Controllable Conserved Water <br />Based on discussions with Boyle and direction from the Water Action Plan Committee, an <br />annual volume of 5,000 acre-feet was contributed to the Environmental Account from Lake <br />McConaughy storage in each October. <br />Dawson/Gothenburg Canal GW Recharge <br />Due to time constraints and the need for additional modifications to model this component, the <br />EIS team did not model this recharge project. It is noted that the projected yield is <br />approximately 1,300 acre-feet. It is assumed that the project is feasible (i.e. enough "excess" <br />remains to reregulate), and that the yield of 1,300 acre-feet is somewhat included in the other <br />projects over/under-estimate of the total yield. <br />Tamarack Phase III <br />(Yield of 27.8 kaf exchanged into EA) <br />This was modeled by increasing the pumping capacity of Wells 1, 2, 3, & 4 such that the <br />reregulated volume exchanged into the McConaughy EA approximated the target level of 27,000 <br />acre-feet. <br />Total Score <br />The total score of the combined North Platte, South Platte, and Central Platte projects is <br />approximately 144 kaf.
The URL can be used to link to this page
Your browser does not support the video tag.