My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Headwaters Corporation Position Descriptions
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
Headwaters Corporation Position Descriptions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:38:23 PM
Creation date
6/11/2009 2:55:25 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.600
Description
Request for Proposals
State
CO
Basin
South Platte
Water Division
1
Date
11/3/2008
Author
Headwaters Corporation
Title
Headwaters Corporation Position Descriptions
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6 _ r <br />Summary of Headwaters Corporation Staff and Program Roles <br />Name Title % on Pro ram <br />J. Kenn Executive Director 100% <br />B. Courtne Director of Water Resources En ineerin 60% <br />L. Belanger Assistant Level Technical Support Water Resources 0% (current) <br />50% ( O1/09 <br />Vacant Assistant Level Technical Su ort Water Resources 100% ( 06/09 <br />B. Sackett Director of Land Ac uisition and Mana ement 100% <br />Vacant Land Manager 100% ( 01/09) <br />C. Smith Director of Natural Resources/Adaptive Management 100% <br />Vacant Assistant Level Technical Su ort Natural Resources 100% 03/09 <br />J. Farnsworth Director of Technical Su art Services 100% <br />J. Brei Assistant Level Technical Su ort 100% <br />B. Barron Director of Outreach/O erations 100% <br />D. Narber Administrative Assistant 100% <br />Page 5 of 5
The URL can be used to link to this page
Your browser does not support the video tag.