My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Missouri River Emergent Sandbar Habitat
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
Missouri River Emergent Sandbar Habitat
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:38:09 PM
Creation date
6/10/2009 1:39:18 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.100
Description
Adaptive Management Workgroup
State
CO
Basin
South Platte
Water Division
1
Date
1/1/3000
Author
C. Aron, J. Ledwin, M. Olson, USFWS, K. Crane, T. Fleeger, C. Fleming, T. Reining, W. Werkmeister
Title
Missouri River Emergent Sandbar Habitat
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Context for Project <br />• Consultation contentious, river operations <br />subject of multiple litigation <br />• In year 7 of BO implementation without <br />required Adaptive Management Program in <br />place <br />• Long-term data sets for tern and plover <br />numbers and productivity <br />• Ongoing Monitoring and Research Program <br />without clear understanding of use of <br />data/analyses <br />Problem Statement <br />• How much, where and by which means to <br />create Emergent Sandbar Habitat (ESH) in <br />each year for tern and plover nesting and <br />brood rearing in Gavins' Reach? <br />Outstandingly Remarkable <br />Values <br />• Fish and Wildlife <br />• Recreation <br />• Cultural Resources <br />• Historical Resources <br />Context for Project <br />• FWS/NPS supports flow management to <br />address habitat needs <br />• NPS believes long-term legal conflicts are <br />imminent <br />• Corps believes habitat can be mechanically <br />created without flow (huge political issue) <br />- Downstream flood constraints <br />- Other authorized purposes <br />• Upcoming PEIS on ESH rather than current <br />project by project approach <br />• Change comes hard <br />Objectives <br />• Minimize cosUacre <br />• Meet fledge ratios <br />• Minimize construction-related disturbance <br />• Meet acreage target 2015 <br />• Minimize socio-economic impacts <br />• Maximize Expected Minimum Population Size (MEMPS) <br />to 20XX <br />• Minimize cumulative impacts to outstandingly <br />remarkable values' and freeflowing charactenstics and <br />water quality <br />* As defined in the Witd and Scenic Rivers Act <br />Actions <br />• Build X acres in year t <br />• Deveg Y acres in year t <br />• Deveg and top Z acres in year t <br />• Flow <br />- Island building <br />- Conditioning <br />- Low summer <br />6
The URL can be used to link to this page
Your browser does not support the video tag.