Laserfiche WebLink
f <br /> <br />26 <br />Table 10. Flow changes (in ci=s) at three stream gaging stations <br />in the Big Bend reach of the F?latte River during late June and <br />early July 1988. U.S. Geol. Surv., unpubl. data. <br />Gaging Station <br />Date <br />Overton <br />Odessa <br />Grand <br />Island <br />27 June 111 15 <br />28 June . 118 15 <br />29 June 120 11 <br />30 June 939 65 <br />1 July 3881 918 <br />2 July 2858 2600 <br />3 July 2355 2191 <br />4 July 1502 1610 <br />5 July .999 834 <br />6 July .613 549 <br />111 <br />99 <br />161 <br />376 <br />447 <br />414 <br />1936 <br />2510 <br />2256 <br />1652