My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EIS Hydrology Model Inputs and Outputs
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
EIS Hydrology Model Inputs and Outputs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:38:01 PM
Creation date
6/9/2009 3:43:34 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.250
Description
Water Issues
State
CO
Basin
South Platte
Water Division
1
Date
1/21/2000
Author
Platte River Governance Committee
Title
EIS Hydrology Model Inputs and Outputs
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EIS ITYDROLOGY MODEL INPUTS <br />The EIS is using the 1947-1994 period of record adjusted to `Present Conditions' <br />Inflows <br />North Platte Model <br />System Inflow above Seminoe Reservoir, Medicine Bow River, Sweetwater River, <br />Laramie River <br />Central Platte Model <br />Inflow at Julesburg, Lewellen, Birdwood Creek <br />South Platte Model South Platte above Chatfield, Clear Creek, South Platte Supply Cana1, St. Vrain <br />Creek, Big Thompson River, Cache La Poudre River <br />Environmental Water <br />`Program' or other Alternative water is identified as a separate input at the point it <br />originates <br />Reach Gains <br />River gains (and losses) are provided for specific river reaches in all models <br />Irrigation Demands <br />By individual canal or `lumped' river reaches <br />Physical System Information <br />Reservoir Capacities <br />Cana1 Capacities <br />Reservoir Content vs Elevation and Surface Area Curves or Tables (Evap, Power, etc.) <br />Turbine Capacities, Reservoir Outlet Capacities, Spillways <br />Operating Criteria <br />Reservoir `target' storage levels <br />Reservoir Release Criteria for different time periods <br />Minimum canal requirements, if any <br />Minimum flows or releases for specific reaches (Miracle Mile, Casper Area, etc.) <br />Turbine Operation time/maintenance schedules <br />Instream Flow Targets <br />Environmental Account operating criteria <br />Other operating criteria relating to specific `projects', or water conservation/supply <br />alternatives <br />January 21, 2000 Platte River Govemance Committee Meeting, North Platte, NE
The URL can be used to link to this page
Your browser does not support the video tag.