Laserfiche WebLink
Reservoir Operating Studies <br />a refill decree for 35,026 of having a 1981 priority. For modeling purposes, only the first fill <br />decree was assumed to be transferred to Elkhead. <br />Table 2-2 lists the relative priorities of water rights and demands explicitly represented in <br />various scenarios in the basin model. <br />Table 2-2 <br />Summary of Modeled Water Rights. Listed by Priority <br />Maybell Canal <br />Senior Municipal <br />Hayden Station <br />Hayden Station <br />Senior Agriculture <br />Juniper Project4 <br />Four Counties <br />Craig Station <br />Stagecoach Res. <br />California Park <br />Steamboat Lake <br />Elkhead Res. <br />Mt. Werner (dom) <br />Stagecoach Res. <br />Lake Catamount <br />Elkhead Res. <br />Craig Station <br />Junior Agriculture <br />Mt. Werner (snow) <br />Steamboat Lake <br />Steamboat Springs Wells' <br />Future Mining <br />Future Coal Gas <br />Future Agriculture <br />42.2 cfs <br />varies' <br />27.0 cfs2 <br />3.0 cfs2 <br />varies3 <br />n.a. <br />varies <br />45.7 cfs <br />11,614 of <br />36,536.1 of <br />23,064 of <br />5,389 of <br />2.7 cfs <br />22,105 of <br />7,800 af5 <br />8,310 of <br />44.9 cfs <br />varies <br />7.4 cfs <br />3,300 of <br />26810.18172 <br />n.a. <br />35987.27982 <br />36295.17380 <br />n.a. _ <br />38714.00000 <br />39599.00000 <br />40815.00000 <br />40815.00000 <br />41126.00000 <br />41727.40833 <br />42642.00000 <br />42962.00000 <br />44559.44488 <br />44761.00000 <br />44925.44731 <br />45290.44865 <br />n.a. <br />47859.00000 <br />51134.43234 <br />Notes: <br />1) Includes all gage adjustments to reach 1989 potential levels for all municipal demands over <br />entire study period " future municipal demands at Craig and Hayden. <br />2) Hayden Station decrees combined into a single 30 cfs water right in. model. Current <br />potential demand modeled as gage adjustment. <br />3) Includes gage adjustments to achieve 1989 potential demands and dry-year increments. <br />4) Not operated in all scenarios and operated in a subordinated priority position in some <br />scenarios. <br />5) Only 1,300 of/yr evaporation depletion actually modeled. <br />6) Includes all existing irrigation depletions estimated by Division 6 to be relying on water <br />rights adjudicated junior to 1954 Juniper project rights. <br />7) Future Steamboat Springs municipal demand, augmented from Stagecoach. <br />2-6