Laserfiche WebLink
<br />TABLE OF CONTENTS (continued) <br />r, <br />LIST OF TABLES <br /> <br /> <br /> <br />1 <br /> <br /> <br />LJ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Table 1 Water Rights Summary <br />Table 2 Summary of C1 Data Set Revisions \ <br />Table 3 Estimated CROPS Bypasses /Releases (Acre-Feet) <br />Table 4 Summary of Shortages to junior Water Right Priorities <br />Table 5 Release Capacity Calculations for Green Mountain Reservoir <br />Table 6 Release Capacity Calculations for Ruedi Reservoir <br />Table 7 Release Capacity Calculations for Wolford Mountain Reservoir <br />Table 8 Release Capacity Calculations for Williams Fork Reservoir <br />Table 9 Release Capacity Calculations for Granby Reservoir <br />Table 10 Total Available Capacity During 10-Day Peak from All 5 Reservoirs for Period of Study <br />Table 11 Potential CROPS Release for Share the Pain Alternative for 10-Day Peak <br />Table 12 Potential Total CFOPS and CROPS Release for Share the Pain Alternative for 10-Day <br />Peak <br />Table 13 Effects on Winter Colorado River Flows from Removal of the Shoshone Priority Call <br />Table 14 Effects on Colorado River Flows at Head of 15-Mile Reach from Share the Pain <br />Alternative with 111,000 AF of Future Demands <br />Table 15 Summary of Alternatives <br />P:\Data\GEN\CWCB\19665\Report Phase2\FinalReport9.03\Final_CFOPS_Report(9-03).doc iv