Laserfiche WebLink
<br />' Available Release Capacip, = Max. Channel Cap. - C1 Data Set Fourth Revision Release - <br />estimated CROPS Bypass. <br />' The determinations of outlet capacity are presented in Tables 5 through 10 for Green Mountain, <br />Ruedi, Williams Fork, Wolford Mountain and Granby Reservoirs respectively. Table 10 presents total <br />' available release capacity during the 10-day peak period from the five reservoirs for the study period. <br />Table 11 presents potential CFOPS releases for the Modified "Share the Pain" alternative for the 10- <br />day peak and Table 12 presents potential total CFOPS and CROPS release for the Modified "Share <br />the Pain" alternative for the 10-day peak. <br />2.3.16 Sensitivity Analysis Procedures Concerning Potential Shortages to junior Water <br />2.3.18 Homestake Reservoir <br />Analysis in Technical Memorandum No. . 7 (Pp endix A H) originally sun ' ?ested that StateMod <br />and the C1 Data Set were not adequately characterizing Homestake Reservoir.. In subsequent analysis, this <br />apparent problem was determined to result from the operating policy for Homestake Reservoir <br />contained in the C1 Data Set. Contact with Colorado Springs Utilities resulted in confirmation that <br />the operating policy for Homestake Reservoir contained in the C1 Data Set is the Colorado Springs <br />Rights <br />The effects of making CFOPS and CROPS releases/bypasses on water rights with junior priorities was <br />estimated by the following. <br />Shortages to juniors =(Diversion by Structure X in Month M in C1 Data Set Fourth Revision) -(Diversion <br />by Structure X in Month M in C1 Data Set Fourth Revision with CFOPS releases and CROPS <br />releases/bypasses. <br />2.3.17 Sensitivity Analysis Procedures Concerning Effects of General Removal of Shoshone <br />' Priority Call on Winter Colorado River Flows <br />The following procedure was employed to calculate the effect of removing the Shoshone priority call <br />on winter (November through April) Colorado River flows upstream of Shoshone and at the head of <br />the 15-Mile Reach: <br />¦ The Cl Data Set Fourth Revision monthly flows were obtained for the study period <br />from the C1 Data Set for the node at the head of the 15-Mile Reach and immediately <br />upstream of Shoshone. <br />¦ The flows for the same nodes and with removal of the Shoshone priority call were <br />calculated for the C1 Data Set Fourth Revision using the same procedure as detailed in <br />Technical Memorandum No. 9 (See Appendix J). <br />' Flom change = (C1 Data Set Fourth Revision) - ? of om with removal o Shoshone call calculated usin <br />8 <br />procedures from Technical Memorandum No. 9). <br />i <br />P:\Data\GEN\CWCB\19665\Report Phase 2\FinalReport9.03\Final_CFOPS_Report(9-03).doc 30