My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9600
CWCB
>
UCREFRP
>
Public
>
9600
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:36 PM
Creation date
6/1/2009 11:45:35 AM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
9600
Author
Brown and Caldwell.
Title
Phase 2 Coordinated Facilities Water Availability Study for the Endangered Fishes of the Upper Colorado River - Final Report.
USFW Year
2003.
USFW - Doc Type
\
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2.3 ASSUMPTIONS AND ANALYSIS PROCEDURES <br />2.3.1 Model <br />Evaluation and analysis of the various alternatives was performed using StateMod, the State of <br />Colorado's Stream Simulation Model by determining the effects of the various alternatives on the nine <br />major reservoirs in the Upper Colorado River Basin (see Table 1). StateMod was originally developed <br />for the Colorado River Decision Support System (CRDSS) and is a monthly water allocation and <br />accounting model with flexibility to become a daily model. It can be used to make comparative <br />analyses for assessing various water management policies and practices utilized in the administration of <br />a river basin. The model's operation is governed by basin hydrology, water rights associated with <br />diversion and storage structures, and the operating rules used for the diversion and storage structures. <br />StateMod uses four types of water rights: direct flow rights, instream flow rights, reservoir storage <br />rights, and operational rights. Water rights are sorted by priority and river administration is simulated <br />using the Prior Appropriation Doctrine. <br />1 <br /> <br />r? <br />1 <br /> <br /> <br /> <br /> <br />1 <br /> <br />t <br /> <br />StateMod was selected for this analysis for several reasons. It can be operated on a monthly time step <br />that allows for fast execution and a reasonable volume of output to be analyzed. The simulations on a <br />monthly time step will generally be adequate for assessing the impacts of potential changes to water <br />management policies within the basin. In those cases where the impacts need to be examined at <br />shorter time intervals, StateMod can be set up to run on a daily time step. Input to the daily version of <br />the model can be daily data for stream flow, diversion demands, and reservoir targets, or a set of values <br />- for distributing- themonthly data. _ -- <br />Routing of reservoir releases (lag times, etc.) is not included in either the monthly or daily model <br />because: (1) StateMod is primarily a planning model; (2) the additional detail required to properly <br />implement reservoir releases with a travel time component is not justified because the system would <br />have to include some kind of forecasting to know a reservoir release is required before a reservoir <br />demand occurs; and (3) the volume of water associated with a potential under-release that occurs by <br />ignoring travel time before a reservoir demand is known is offset by the potential over-release that <br />occurs after the demand is satisfied. <br />2.3.2 Baseline Hydrology: C1 Data Set <br />2.3.2.1 C1 Data Set. The PBO employs the hydrology from the C1 Data Set developed for the PBO <br />for investigative purposes. In the C1 Data Set, irrigation demands are calculated from average <br />irrigation efficiencies for the study period, 1975-1991. Irrigation efficiencies were calculated for <br />CRDSS based on historic data for the Colorado River Basin in Colorado (Moore, 1999). The Cl Data <br />Set also includes "backcasting" of 1995 water year demands throughout the entire study period for <br />selected major structures. Average annual depletions for these existing demands are used for every <br />year. Depletions from demands that were in place for only a portion of the 1975-1991 period were <br />included in the C1 Data Set for the entire study period. Depletions from new demands such as Ruedi <br />Reservoir Round 1 and 2 water sales are also included. [See Appendix F of the Final PBO (U.S. Fish <br />and Wildlife Service, December 20,1999) for a listing of all projects included in the backcast 1995 <br />demand levels.] <br />PAData\GEN\CWCB\19665\Report Phase 2\FinalReport9.03\Final_CFOPS_Report(9-03).doc 19
The URL can be used to link to this page
Your browser does not support the video tag.