Laserfiche WebLink
<br />TABLE OF CONTENTS (continued) <br /> <br />APPENDICES <br /> <br />1 <br /> <br />Appendix A: Technical Memorandum No. 1 Concerning Analysis of AlternativelA, Expanded <br />Coordinated eservoir operations of Green Mountain Reservoir, Reduce Winter Power Operations, <br />Draft Dece ber 2000, Revised October 2001 <br />Appendix B: Technical Memorandum No. 2; Analysis of Alternative 1A, Expanded Coordinated <br />Reservoir O erations of Green Mountain Reservoir, Including Green Mountain Reservoir Preemptive <br />Release and elease of Water Carried Over in Green Mountain Reservoir, Draft March 2001, Revised <br />October 200 <br />' Appendix C: Technical Memorandum No. 3: Analysis of Alternative 1A, Expanded Coordinated <br />Reservoir O erations of Green Mountain Reservoir, Conjunctive Pool Operations, Draft March 2001, <br />' Revised Oct ber 2001 <br /> Appendix D: Technical Memorandum No. 4: Analysis of New Storage Facilities Below Shoshone, <br />' Draft March 2001, Revised October 2001 <br /> Appendix E: Technical Memorandum No. 4a: Analysis of Alternative 4, New Storage Facility at <br />' Webster Hill Site, Mainstem Colorado River, Draft June 2001, Revised October 2001 <br /> Appendix F: Technical Memorandum No. 5: Analysis of Alternative 1b, Expanded Coordinated <br /> - Reservoir Op erations of Ruedi Reservoir, Draft June 2001, Revised October 2001 <br /> Appendix G Technical Memorandum No. 6: Analysis of 2001 Spring Peak Flow conditions and <br /> Comparison to Results of StateMod Modeling for CFOPS Alternatives Investigation, Draft June 2001, <br />' Revised Octo ber 2001 <br /> Appendix H Technical Memorandum No: 7: Investigation of Alternative 1f, Bypass Diversions to <br />' Storage and lternative 1g, Reduce Constraints on CROP, October 2001 <br /> Appendix 1: Technical Memorandum No. 8: Investigation of Alternatives 1 d, CBT West Slope <br />' Facilities Op rations, and Alternative 5a, East Slope Power Operations and Scheduling, October <br /> 2001 <br /> Appendix J: Technical Memorandum No. 9: Investigation of Alternative 5b, Expanded Coordinated <br /> Reservoir Op erations, Shoshone Power Plant, October 2001 <br />' Appendix K Technical Memorandum No. 10: Investigation of Alternative 6a, Insurance Pool, <br /> October 20 1 <br /> Appendix L: Technical Memorandum No. 11: Investigation of Alternative 1e, Expanded <br /> Coordinate Reservoir Operations, Denver Water Systems Operations, October 2001 <br />' Appendix Technical Memorandum No. 12: Comments and Responses to Comments Received on <br /> Draft, Janua 2003 Phase 2 Coordinated Facilities Water Availability Study for the Endangered Fishes <br />' of the Uppe Colorado River Final Report, March 2003 <br /> <br /> PAData\GEN\ CB\19665\Report Phase 2\Fi WReport9.03\Final_CFOPS_Report(9-03).doc viii