My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9387
CWCB
>
UCREFRP
>
Public
>
9387
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:35 PM
Creation date
6/1/2009 11:37:02 AM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
9387
Author
Brookshire, D. S., M. McKee and S. Stewart.
Title
A Four Corners Regional Focus on the Economic Impact of Critical Habitat Designation for teh Razorback Sucker, Humpback Chub, Colorado Squawfish, and Bonytail.
USFW Year
1997.
USFW - Doc Type
Albuquerque.
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />injection of $706,728/yr into the tribal economy. For the years 2010-2040 it was assumed that <br />all of the tribe's water (32,000 AF/yr) would be leased outside, which represents an annual <br />injection of $4,224,000 into the tribal economy at the assumed 1995 lease rate. <br />San Juan-Gallup <br />The San Juan River Gallup/Navajo Water Supply Project, which would entail the construction of <br />pipelines to the city of Gallup as well as use of some existing NIIP features, would provide 7,826 <br />AF/yr of agricultural water and 23,174 AF/yr of municipal and industrial water. Because Section <br />7 consultation is not scheduled to begin until 2000, construction was assumed to start in 2000 <br />and have water delivered by 2002. <br />C. Regional Economic Baseline Projection (WOFBA) for the Region <br />The WOFBA baseline projection, which includes the additional economic activity made possible <br />by localized water projects, was made for the period 1995-2040. The underlying assumption is <br />that all of the projects described in section 4-B will be built. For this study, the economic <br />measures are output and employment. These are reported for the region and for the aggregate <br />tribal economies. <br />For 1996, two projects were assumed to begin: NIIP Blocks 8 and 9, which provide agricultural <br />water to the Navajo reservation and are expected to start water deliveries by 1998 and 2000. <br />respectively; and ALP Phase I, Stage A, which provides tribal and non-tribal M&I water to <br />Colorado and New Mexico, and is expected to be operational by 2003. ALP Phase I, Stage B, <br />which provides irrigation water to Colorado and New Mexico should begin construction in 1998 <br />and be fully operational by 2005. Construction on NIIP Block 10 should begin in 1999. with <br />water deliveries possible by 2001. The year 2000 marks the beginning of NIIP Block 11. the San <br />Juan-Gallup Project (SJG), and the San Juan-Chama (SJC) water leasing. Both NIIP Block 11 <br />and SJG are expected to be operational by 2002. SJC water leasing initially diverts 5.354 AF/yr <br />28
The URL can be used to link to this page
Your browser does not support the video tag.