Laserfiche WebLink
"new" water yield (from Step 1) <br /> Will <br />Project will not Historical or <br />Hs l o project yes 2. Determine flow regime to Steps <br />affect watershed streamflow affect flow <br />regime with project 4 and 5 <br />(from Step 1) data ? <br /> no <br /> 2. Determine flow regime to Steps <br />remedial without project 4 and 5 <br /> <br />measures n n <br />new <br />From <br /> sediment <br />Step 1 <br /> yield <br /> 3. Is 3. <br /> <br />Project will not channel <br />yes <br />i <br />ilib <br />i Will <br />project <br />no <br />3• Measure existing <br />to <br />step 5 31 <br /> affect watershed n equ <br />r <br />um <br />? affect channel structure <br />o (from Step 1) channel <br /> <br /> yes <br /> no <br /> Can Determine new to Step 5 <br /> <br />3. Postpone 3• <br />Can <br />new channel channel structure <br /> study until yes study structure or yes <br /> channel be no remedial <br /> equilibrium postponed measures <br /> restored ? be deter- <br /> mined <br />? <br />Determine appropriate <br /> remedial measures <br />no <br />Figure 3. Step 2 (top): Determine flow regime with and without project; and <br />Step 3 (bottom): Determine channel structure with and without project.