Laserfiche WebLink
yes 1. Postpone study until <br />equilibrium is <br />reestablished <br />v <br />no <br />Sta rt 1 . <br />Is <br />watershed <br />in equilibrium <br />/ 1. \ <br />Can <br />study be <br />postponed <br />., ? i <br />. <br />W 1 ill \ <br />project affect <br />\ watershed <br />remedial <br />measures <br />no 1. <br />Pred i ct <br />"new" equilibrium <br />yes conditions or <br />remedial <br />measures <br />"new" <br />equilibrium <br />conditions <br />I Determine effectiveness <br />of remedial measures <br />Determine to Step 2 <br />"new" water yield <br />Determine to Step 3 <br />"new" sediment yield <br />Determine to Step 4 <br />"new" chemical/thermal <br />yield <br />no <br />Figure 2. Step 1 (Figure 1): Determine watershed influences <br />on macrohabitat characteristics with and without project. <br />to Step