Laserfiche WebLink
6/25/96 ...1:02 PM Camp Dresser & McKee Inc. Page 1 of 1 <br />Attachment B <br />Hydrological Revisions for Section 7 Consultation <br />Replacement of the Plateau Creek Pipeline <br /> Ponds Subcate ory Bn:akdown: _ ____ _ _. _ <br /> <br /> Desi nation: 5A -All Ponds Pro'ects Distributions event A ril -November <br /> <br />Project Name Pre or Ann De letion Desi nation Monthl Distribution ct <br /> Post RIP (AF) Code Nov Dec Jan Feb Mar Apr Ma Jun Jul Aug Sep Oct <br />All Ponds Post 3,003.04 5A 12.5% 12.5% 12.5% 12.5% 12.5% 12.5% 12.5% 12.5% <br />Subtotal 3,003.04 <br /> <br /> <br />Pro ect Name Pre or Ann De letion Desi nation Monthl Distribution AF <br /> Post RIP A Code Nov Dec Jan Feb Mar Apr May Jun Jul Au Se Oct <br />All Pons Post 3,003.04 5A 375.38 375.38 375.38 375.38 375.38 375.38 375.38 375.38 <br />Subtotal 3,003.04 375.38 375.38 375.38 375.38 375.38 375.38 375.38 375.38 <br />78ASE.XLS ... Sub-Ponds <br />