Laserfiche WebLink
<br />6/25/96 ... 1:00 PM <br />Camp Dresser f~ McKee Inc. <br />Page 1 of 1 <br />Attachment B <br />Hydrological Revisions for Section 7 Consultation <br />Replacement of the Plateau Creek Pipeline <br />_ M & I Subcate ory Breakdown: __ <br /> - - - ~ - <br /> Desi nation: 2A - All M 8 I Pro'ects Distributions even) ear round) <br /> <br />Project Name Pre or Ann De letion Desi nation Monthl Distribution ct <br /> Post RIP AF) Code Nov Dec Jan Feb Mar Apr May Jun Jul Au Sep Oct <br />All M 8 I Post 1,434.30 2A 8.3% 8.3% 8.3% 8.3% 8.3% 8.3% 8.3% 8.3% 8.3% 8.3% 8.3% 8.3% <br />Subtotal 1,434.30 <br /> <br /> <br />Pro ect Name Pre or Ann De letion Desi natlon Monthl Distribution AF <br /> Post RIP A~ Code Nov Dec Jan Feb Mar A r Ma Jun Jul Au Sep Oct <br />All M ~ I Post 1,434.30 2A 119.53 119.53 119.53 119.53 119.53 119.53 119.53 119.53 119.53 119.53 119.53 119.53 <br />Subtotal 1,434.30 119.53 119.53 119.53 119.53 119.53 119.53 118.53 119.53 119.53 119.53 119.53 119.53 <br />7BASE.XLS ... Sub-M8~1 <br />