Laserfiche WebLink
<br />6/25/96 ... 1:09 PM <br />Camp Dresser & McKee Inc. <br />Page 2 of 3 <br />Table 3.8 <br />~ <br />Basin Section 7 Consultations <br />List of Previous Colorado River <br />Replacement of the Plateau Creek Pipeline <br /> <br /> Impact of Previous Section 7 Consul tations on Avera a Colorado River Baseline Flows <br /> <br /> Grou Desi nat ion Descriptions: 1. Reservoir Projects (Depletion Impacts - A ril throu h June ) <br /> 2. M & I (Depletion Impacts -Year Round <br /> 3. Ski Areas (De letion Impacts - November throw h March) <br /> 4. Oil Shale Projects (Depletion Impacts -Undefined) <br /> 5. Ponds (De letion Impacts -April -November <br /> <br />Project Name Pre or Annual De letion Desi nation Subcate or Grou <br /> Post RIP (AF) Number Designation (5) 1 2 3 4 5 <br />Clow h-Alber Ponds Post 1.28 5 - - - - 1.28 <br />BLM Pro rammatic <125 Post 1,400.00 5 - - - - 1,400.00 <br />Grand Valle BLM Stock Pond Post 21.00 5 - - - - 21.00 <br />Ruedi Round 2 Water Sales (3) Post - 1 - - - - - <br />Frei & Sons Post 388.00 5 - - - - 388.00 <br />Town of Newcastle Post 2.00 2 2A - 2.00 - - - <br />Bluestone/Roan Creek Post 2,000.00 1 1 E 2,000.00 - - - - <br />Everist Gravel Post 4.00 5 - - - - 4.00 <br />Snowmass Ranch Post 83.00 2 2A - 83.00 - - - <br />Flanne Reservoir Post 133.00 1 1 E 133.00 - - - - <br />Lake Windemere Post 4.00 5 - - - - 4.00 <br />Evens/MC Kenzie Ponds Post 0.39 5 - - - - 0.39 <br />West Pond Post 0.16 5 - - - - 0.16 <br />Palmer Creek Post 0.94 5 - - - - 0.94 <br />Carns Pond Post 8.00 5 - - - - 8.00 <br />D Hollow Creek Post 2.30 5 - - - - 2.30 <br />Town of Granb Post 41.00 2 2A - 41.00 - - - <br />Welfelt Wetland Post 4.50 5 - - - - 4.50 <br />Den Pond Post 0.43 5 - - - - 0.43 <br />Avon Metro Post 1.10 2 2A - 1.10 - - - <br />Independence Pond Post 2.50 5 - - - - 2.50 <br />Pollard Pond Post 3.72 5 - - - - 3.72 <br />Alpine Land Develo ment Post 254.60 2 2A - 254.60 - - - <br />Upper Ea le Diversion Post 603.00 2 2A - 603.00 - - - <br />Uranium Mill Tailings Rifle Post 215.00 2 2A - 215.00 - - - <br />Uranium Mill Tailin Grand Junction Post - 2 2A - - - - - <br />Naval Oil Shale #3 Post 4.80 2 2A - 4.80 - - - <br />White Banks Alabaster Post 1.00 2 2A - 1.00 - - - <br />76ASE.XLS ... Detail <br />