My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6010
CWCB
>
UCREFRP
>
Public
>
6010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:28 PM
Creation date
5/22/2009 7:30:27 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
6010
Author
Binns, A., et al.
Title
The Planning, Operation, and Analysis of the Green River Fish Control Project.
USFW Year
1964.
USFW - Doc Type
\
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LIST OF FIGURES <br />v <br />Figure page <br />1. Portion of the Green River included in the chemical treatment..F rontispiece <br />2. Rotenone hose line as constructed for the pilot treatment...... 23 <br />3. Refined plumbing system used to carry chemical from barrels to <br /> hose extending across river ................................. 24 <br />4. View of a drip station ......................................... 25 <br />5. An air-thrust boat used on the project ......................... 26 <br />6. Hand back pump in use .......................................... 27 <br />7. Helicopter spraying on isolated channel ........................ 28 <br />8.= Letter of notification of the project which was sent to all <br />' landholders along the treatment route ....................... 29 <br />9. Map given to all station crews showing the drip station <br /> locations and main and side roads ar trails ................. 30 <br />10. Line of responsibility for river treatment operations.......... 31 ~. <br />11. Location~of the detoxification station below Flaming Gorge Dam. 52 <br />12. Pellet-type fish food dispenser which was used to distribute <br /> crystalline potassium permanganate ............................. 53 <br />13. Method of placement of permanganate dispersers through bridge <br /> floor ....................................................... 54 <br />14. Average speed of rotenone breakdown in relation to distance <br /> traveled .................................................... 55 <br />~ ~~ ~~:;~,~.W ..~t,,,;,;,: - - <br />
The URL can be used to link to this page
Your browser does not support the video tag.