Laserfiche WebLink
<br />LIST OF FIGURES <br />v <br />Figure page <br />1. Portion of the Green River included in the chemical treatment..F rontispiece <br />2. Rotenone hose line as constructed for the pilot treatment...... 23 <br />3. Refined plumbing system used to carry chemical from barrels to <br /> hose extending across river ................................. 24 <br />4. View of a drip station ......................................... 25 <br />5. An air-thrust boat used on the project ......................... 26 <br />6. Hand back pump in use .......................................... 27 <br />7. Helicopter spraying on isolated channel ........................ 28 <br />8.= Letter of notification of the project which was sent to all <br />' landholders along the treatment route ....................... 29 <br />9. Map given to all station crews showing the drip station <br /> locations and main and side roads ar trails ................. 30 <br />10. Line of responsibility for river treatment operations.......... 31 ~. <br />11. Location~of the detoxification station below Flaming Gorge Dam. 52 <br />12. Pellet-type fish food dispenser which was used to distribute <br /> crystalline potassium permanganate ............................. 53 <br />13. Method of placement of permanganate dispersers through bridge <br /> floor ....................................................... 54 <br />14. Average speed of rotenone breakdown in relation to distance <br /> traveled .................................................... 55 <br />~ ~~ ~~:;~,~.W ..~t,,,;,;,: - - <br />